• Main Navigation
  • Main Content
  • Sidebar
JMTS: Jurnal Mitra Teknik Sipil
  • Login
  • ⌂ Site
  • ⌂ Home
  • Current
  • Archives
  • Announcements
  • About
    • About the Journal
    • Submissions
    • Editorial Team
    • Reviewer Team
    • Privacy Statement
    • Contact

Search

Advanced filters

Search Results

PENYEBAB TERJADINYA SISA MATERIAL PADA BANGUNAN GEDUNG SUPERMARKET

DOI : 10.24912/jmts.v5i1.16648
Kristoforus Gregorius , Mega Waty
page 129-140
Abstract : 269 | PDF : 261
DOI : 10.24912/jmts.v5i1.16648

ANALISIS PERANAN KONSULTAN MANAJEMEN KONSTRUKSI DALAM MENCEGAH KETERLAMBATAN WAKTU KONSTRUKSI

DOI : 10.24912/jmts.v5i1.16651
Albert Darmali , Mega Waty
page 141-152
Abstract : 2245 | PDF : 2715
DOI : 10.24912/jmts.v5i1.16651

ANALISIS FAKTOR-FAKTOR PENYEBAB COST OVERRUN PADA PROYEK RUMAH INDONESIA SEHAT

DOI : 10.24912/jmts.v5i1.16649
Felix Putra , Mega Waty
page 15-24
Abstract : 300 | PDF : 402
DOI : 10.24912/jmts.v5i1.16649

DAMPAK CHANGE ORDER PADA PROYEK PERKERASAN JALAN

DOI : 10.24912/jmts.v3i1.7023
Alexander Junius , Mega Waty
page 199-206
Abstract : 451 | PDF : 677
DOI : 10.24912/jmts.v3i1.7023

PENYEBAB CHANGE ORDER PADA PROYEK PERKERASAN JALAN

DOI : 10.24912/jmts.v3i1.7012
Philander Edward , Mega Waty
page 207-214
Abstract : 410 | PDF : 449
DOI : 10.24912/jmts.v3i1.7012

ANALISIS KORELASI BIAYA CHANGE ORDER TERHADAP BOBOT PEKERJAAN PADA DUA PROYEK JALAN ASPAL PROVINSI BANTEN

DOI : 10.24912/jmts.v3i1.6965
Dominicus Edwin , Mega Waty
page 175-182
Abstract : 357 | PDF : 453
DOI : 10.24912/jmts.v3i1.6965

PENERAPAN METODE VALUE ENGINEERING DALAM PEMILIHAN JENIS BETON PADA PROYEK KONSTRUKSI PERUMAHAN

DOI : 10.24912/jmts.v0i0.10408
Juan Aditya Kencana , Mega Waty
page 261-270
Abstract : 336 | PDF : 758
DOI : 10.24912/jmts.v0i0.10408

ANALISIS SISA MATERIAL DAN PENYEBAB UTAMANYA PADA PROYEK BANGUNAN RUMAH TINGGAL

DOI : 10.24912/jmts.v0i0.10393
Jonathan Felixius , Mega Waty
page 343-352
Abstract : 644 | PDF : 528
DOI : 10.24912/jmts.v0i0.10393

PENYEBAB CHANGE ORDER PADA PROYEK KONSTRUKSI BANGUNAN AIR WILAYAH DKI JAKARTA

DOI : 10.24912/jmts.v0i0.10289
Ivana Ramayanti Hendratno Putri , Mega Waty
page 249-260
Abstract : 393 | PDF : 420
DOI : 10.24912/jmts.v0i0.10289

ANALISIS KORELASI PERSENTASE BIAYA CHANGE ORDER TERHADAP BOBOT PEKERJAAN PADA DUA PROYEK PERKERASAN JALAN KAKU

DOI : 10.24912/jmts.v3i1.6931
Ronaldo Filemon , Mega Waty
page 191-198
Abstract : 327 | PDF : 452
DOI : 10.24912/jmts.v3i1.6931

FAKTOR-FAKTOR YANG MEMPENGARUHI PRODUKTIVITAS TENAGA KERJA PADA BANGUNAN HIGH RISE DI REPUBLIK INDONESIA

DOI : 10.24912/jmts.v3i4.8366
Theodorus Alvin Satrya , Mega Waty
page 1313-1326
Abstract : 627 | PDF : 542
DOI : 10.24912/jmts.v3i4.8366

ANALISIS HUBUNGAN SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA TERHADAP TINGKAT KECELAKAAN PADA PROYEK

DOI : 10.24912/jmts.v3i4.8365
Andi Lay Wirawan , Mega Waty
page 1363-1372
Abstract : 518 | PDF : 1049
DOI : 10.24912/jmts.v3i4.8365

ANALISIS PENERAPAN SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA PADA PEMBANGUNAN GEDUNG DAN PERUMAHAN

DOI : 10.24912/jmts.v3i3.8324
Steven Steven , Mega Waty
page 547-554
Abstract : 578 | PDF : 881
DOI : 10.24912/jmts.v3i3.8324

IDENTIFIKASI FAKTOR PENYEBAB COST OVERRUN (PEMBENGKAKAN BIAYA) PADA PROYEK RUMAH TINGGAL

DOI : 10.24912/jmts.v0i0.12502
Jason Christopher , Mega Waty
page 633-640
Abstract : 600 | PDF : 445
DOI : 10.24912/jmts.v0i0.12502

ANALISIS COST OVERRUNS PADA PROYEK X

DOI : 10.24912/jmts.v7i3.30774
Kevin Mathew , Mega
page 977-986
Abstract : 222 | PDF : 131
DOI : 10.24912/jmts.v7i3.30774

PENGHEMATAN BIAYA PEMBANGUNAN GEDUNG DIPO CENTER DENGAN MUTU BETON BERBEDA

DOI : 10.24912/jmts.v8i1.32635
Evan Suryana Laurensius , Mega Waty
Abstract : 127 | PDF : 122
DOI : 10.24912/jmts.v8i1.32635

ANALISIS PEMANCANGAN TIANG PADA KONSTRUKSI OFFSHORE PELABUHAN DI PULAU JAWA TERHADAP SCOURING EFFECT

DOI : 10.24912/jmts.v2i4.6162
Mega Rukmana , Chaidir A Makarim
page 55-64
Abstract : 583 | PDF : 1376
DOI : 10.24912/jmts.v2i4.6162

ANALISIS SISA MATERIAL PADA PROYEK PEMBANGUNAN PABRIK

DOI : 10.24912/jmts.v5i1.16573
Henry Irawan , Mega Waty
page 87-98
Abstract : 369 | PDF : 431
DOI : 10.24912/jmts.v5i1.16573

PERINGKAT PENGARUH FAKTOR-FAKTOR SMK3L TERHADAP PRODUKTIVITAS TENAGA KERJA PROYEK IT MANDIRI BUMI SLIPI JAKARTA

DOI : 10.24912/jmts.v7i1.24943
Muhammad Nur Irwansyah Amun , Mega Waty
page 45-56
Abstract : 153 | PDF : 215
DOI : 10.24912/jmts.v7i1.24943

PERINGKAT FAKTOR-FAKTOR YANG MEMPENGARUHI TERJADINYA COST OVERRUN PADA PROYEK KONSTRUKSI PADA MASA PANDEMI COVID-19

DOI : 10.24912/jmts.v5i3.20258
Vincent Andian , Mega Waty
page 671-680
Abstract : 181 | PDF : 233
DOI : 10.24912/jmts.v5i3.20258

KAJIAN NILAI DAN PENYEBAB CHANGE ORDER PADA PROYEK GEDUNG KANTOR X DI JAKARTA

DOI : 10.24912/jmts.v8i4.34120
Aurelius Jorrel Wirandy , Mega Waty
page 1257-1270
Abstract : 47 | PDF : 45
DOI : 10.24912/jmts.v8i4.34120

ANALISIS RISIKO KERJA PROYEK PEMBANGUNAN IT MANDIRI BUMI SLIPI

DOI : 10.24912/jmts.v6i4.24917
Bagus Tri Wizaksono , Mega Waty
page 885-898
Abstract : 163 | PDF : 217
DOI : 10.24912/jmts.v6i4.24917

ANALISIS METODE EARNED VALUE UNTUK PREDIKSI PENYELESAIAN PROYEK KONSTRUKSI APARTEMEN X DI TANGERANG

DOI : 10.24912/jmts.v7i3.27975
Christoper Wilanata , Mega Waty
page 873-884
Abstract : 242 | PDF : 225
DOI : 10.24912/jmts.v7i3.27975

PERINGKAT FAKTOR-FAKTOR YANG MEMPENGARUHI PRODUKTIVITAS TENAGA KERJA PADA PROYEK KONSTRUKSI

Celine Faustine , Mega Waty
page 681-692
Abstract : 414 | PDF : 1296

ANALISIS PENYEBAB PEMBENGKAKAN BIAYA PADA PROYEK KONSTRUKSI RUMAH TINGGAL X

DOI : 10.24912/jmts.v8i3.34180
Rosani Surya Bataric , Mega Waty
page 967-976
Abstract : 176 | PDF : 167
DOI : 10.24912/jmts.v8i3.34180
1 - 25 of 37 items 1 2 > >> 

Registrasi

Registrasi

Template

Template

tools

Tools

Plagiarism Tool

 Reference Management Tool, download here

Related image

Use APA Style, download here

 

sinta

Akreditasi

DESKRIPSI GAMBAR

AuthorNotice

Author Notice

Ethical Statement

 

 Authorship Agreement

 

 Copyright Transfer

More information about the publishing system, Platform and Workflow by OJS/PKP.