ANALISIS PENYEBAB PEMBENGKAKAN BIAYA PADA PROYEK KONSTRUKSI RUMAH TINGGAL X
Main Article Content
Abstract
One of the important construction subsectors to fulfill people's basic needs is housing development. However, cost overrun or project cost escalation is one of the difficulties that projects often face during implementation. This research aims to identify and analyze the factors that cause cost overruns in residential construction projects, especially from the point of view of the parties directly involved in the construction process, for example project managers, site engineers, and quantity surveyors. Data was collected through the distribution of questionnaires in the form of Google Forms with a Likert scale ranging from 1-5. With the help of SPSS software, the collected data was processed through validity and reliability tests. Furthermore, the Relative Importance Index (RII) approach was used to analyze the data and identify the main factors causing cost overruns in the X residential construction project. Factors affecting cost overruns in X residential construction project can be ranked using 19 variables that passed the validity and reliability tests out of 22 collected variables. As a result of this study, the main cause of cost overruns in X residential projects is Inaccurate Material and Wage Cost Estimates with an RII value of 0.82.
Abstrak
Salah satu subsektor konstruksi yang penting untuk memenuhi kebutuhan dasar masyarakat adalah pengembangan perumahan. Namun, pembengkakan biaya atau eskalasi biaya proyek adalah salah satu kesulitan yang sering dihadapi proyek selama pelaksanaan. Penelitian ini bertujuan untuk mengidentifikasi dan menganalisis faktor-faktor penyebab pembengkakan biaya (cost overrun) pada proyek pembangunan rumah tinggal, khususnya dari sudut pandang para pihak yang terlibat langsung dalam proses konstruksi contohnya project manager, site engineer, dan quantity surveyor. Pengumpulan data melalui penyebaran kuesioner dalam bentuk Google Form dengan skala Likert yang berkisar 1-5. Dengan bantuan perangkat lunak SPSS, data yang telah dikumpulkan diproses melalui uji validitas dan reliabilitas. Selanjutnya, pendekatan Relative Importance Index (RII) digunakan untuk menganalisis data dan mengidentifikasi faktor-faktor utama penyebab kelebihan biaya dalam proyek pembangunan rumah tinggal X. Faktor-faktor yang mempengaruhi pembengkakan biaya dalam proyek konstruksi rumah tinggal X dapat diberi peringkat menggunakan 19 variabel yang lulus uji validitas dan reliabilitas dari 22 variabel yang dikumpulkan. Hasil dari penelitian ini, penyebab utama pembengkakan biaya dalam proyek rumah tinggal X adalah Estimasi Biaya Material dan Upah yang Tidak Akurat dengan nilai RII sebesar 0,82.
Article Details

This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.
This work is licensed under Jurnal Mitra Teknik Sipil (JMTS) Creative Commons Attribution-ShareAlike 4.0 International License.References
Agyekum, K., Ayarkwa, J., & Adinyira, E. (2021). Cost overrun in construction projects: A review of contributory factors. Journal of Engineering, Design and Technology, 19(3), 565–582. https://doi.org/10.1108/JEDT-07-2020-0296
Alfakhri, M. A., Ismail, S., & Subramaniam, C. (2021). Critical factors contributing to cost overrun in construction projects: A case study in Saudi Arabia. International Journal of Construction Management, 21(6), 543–555. https://doi.org/10.1080/15623599.2019.1592909
Flyvbjerg, B., Holm, M. S., & Buhl, S. (2003). How common and how large are cost overruns in transport infrastructure projects? Transport Reviews, 23(1), 71–88.
Flyvbjerg, B., Ansar, A., Budzier, A., Buhl, S., Cantarelli, C., Garbuio, M., Glenting, C., Holm, M. S., Lovallo, D., Lunn, D., Molin, E., Rønnest, A., Stewart, A., & van Wee, B. (2018). Five things you should know about cost overrun. Transportation Research Part A: Policy and Practice, 118(October 2019), 174–190. https://doi.org/10.1016/j.tra.2018.07.013
Kometa, S., Olomolaiye, P., & Harris, F. C. (2006). Attributes of UK construction clients influencing project
consultants’ performance. Construction Management and Economics, 3(2), 433–443.
Ktaish, B., & Hajdu, M. (2022). Success factors in projects. IOP Conference Series: Materials Science and Engineering, 1218(1), p. 012034. IOP Publishing. https://doi.org/10.1088/1757-899X/1218/1/012034
Mutisya, M. M., & Wanyona, G. (2017). A study of cost overrun in construction projects in Kenya. International Journal of Project Management, 35(6), 1113–1125.
Tengan, C., & Aigbavboa, C. (2020). Analysis of causes of cost overrun in Ghanaian construction projects. International Journal of Construction Supply Chain Management, 10(1), 55–66.
Waty, M., & Sulistio, H. (2022). Causes for the change orders in road construction: Reviewed from owner.
Communications - Scientific Letters of the University of Žilina, 24(2), D72–D84.
https://doi.org/10.26552/com.C.2022.2.D72-D84
Yuliani, E. D., & Kurniawan, A. (2020). Analisis faktor-faktor penyebab pembengkakan biaya proyek konstruksi perumahan. Jurnal Teknik Sipil dan Lingkungan, 5(2), 93–101.