Cover
Articles
OPTIMASI PENGGUNAAN EXCAVATOR DAN DUMP TRUCK PADA PROYEK X DENGAN METODE LINEAR PROGRAMMING
1131-1136
Abstract : 84
|
PDF : 83
ANALISIS PERUBAHAN KUAT GESER PADA TANAH LEMPUNG DAN PASIR AKIBAT PENAMBAHAN FLY ASH TIPE C
1137-1144
Abstract : 53
|
PDF : 64
PERBANDINGAN NILAI KUAT GESER TANAH DENGAN KETEBALAN PEMADATAN 20 CM DAN 40 CM
1145-1150
Abstract : 41
|
PDF : 31
STUDI ANALISIS DAYA DUKUNG FONDASI DANGKAL PADA LERENG GALIAN
1151-1160
Abstract : 40
|
PDF : 36
PENGARUH PERENDAMAN TERHADAP NILAI KUAT UJI TEKAN YANG DIPADATKAN DENGAN CARA PROCTOR PADA BENGKOL
1161-1170
Abstract : 75
|
PDF : 42
TINJAUAN KEKUATAN LENTUR BALOK LEAN DUPLEX BERPENAMPANG HOLLOW BERLUBANG PADA TEMPERATUR TINGGI
1171-1182
Abstract : 59
|
PDF : 33
ANALISIS DAN KALIBRASI PARAMETER DRIVING BEHAVIOR PADA SIMPANG TAK BERSINYAL JALAN PERKOTAAN
1183-1192
Abstract : 251
|
PDF : 184
ANALISIS RISIKO PROYEK JARINGAN TRANSMISI DENGAN METODE DECISION TREE DAN EXPECTED MONETARY VALUE
1193-1206
Abstract : 79
|
PDF : 120
PENGARUH JARAK TEPI ANGKUR ADHESIF TERHADAP KAPASITAS TARIK DENGAN MIDAS FEA NX
1255-1268
Abstract : 54
|
PDF : 30
ESTIMASI KEBUTUHAN MATERIAL BETON STRUKTUR DAN BESI TULANGAN DENGAN METODE REGRESI MULTILINIER
1269-1276
Abstract : 55
|
PDF : 46
ANALISIS STRUKTUR ATAS JEMBATAN RANGKA BAJA TERHADAP BEBAN GEMPA DINAMIK DENGAN METODE NONLINIER TIME HISTORY
1277-1286
Abstract : 109
|
PDF : 127
ANALISIS BIAYA KECELAKAAN LALU LINTAS MENGGUNAKAN METODA GROSS OUTPUT DI JALAN TABATOKI KABUPATEN POSO
1287-1294
Abstract : 87
|
PDF : 46
PENGARUH ANGKUTAN DARING (DALAM JARINGAN) TERHADAP PEMINAT ANGKUTAN KOTA
1295-1302
Abstract : 73
|
PDF : 47
PERENCANAAN TEBAL OVERLAY DAN ESTIMASI BIAYA PERBAIKAN JALAN DENGAN METODE BINA MARGA 2017 DAN 1987
1303-1314
Abstract : 142
|
PDF : 54
ANALISIS DAMPAK PENYEMPITAN JALAN TERHADAP KARAKTERISTIK LALU LINTAS JL. LETJEN ALAMSYAH RATU PRAWIRANEGARA
1315-1330
Abstract : 213
|
PDF : 100
ANALISIS DAMPAK LALU LINTAS AKIBAT PENGOPERASIAN HOTEL NOVOTEL MAKASSAR
1331-1344
Abstract : 66
|
PDF : 38
ANALISA KINERJA JALUR PEDESTRIAN DI JALAN RAYA UBUD
1345-1354
Abstract : 79
|
PDF : 47
EVALUASI KELAYAKAN INVESTASI ASPHALT MIXING PLANT (AMP) PADA PT XYZ (NABIRE, PAPUA TENGAH)
1355-1366
Abstract : 89
|
PDF : 79
ANALISIS PREDIKSI DURASI AKHIR PROYEK DENGAN METODE EARNED VALUE DAN EARNED SCHEDULE
1377-1388
Abstract : 56
|
PDF : 39
SUBTITUSI LIMBAH ABU SEKAM PADI PADA BETON SELF COMPACTING CONCRETE (SCC)
1389-1400
Abstract : 108
|
PDF : 55
PENGARUH UKURAN BENDA UJI KUBUS TERHADAP NILAI KUAT TEKAN RECATIVE POWDER CONCRETE
1401-1406
Abstract : 89
|
PDF : 77
ANALISIS PENGARUH EKSTRAKSI PERKUATAN GALIAN SEMENTARA PADA JALUR PIPA GAS BAWAH PERMUKAAN
1407-1416
Abstract : 68
|
PDF : 51