Cover
Articles
OPTIMASI PENGGUNAAN EXCAVATOR DAN DUMP TRUCK PADA PROYEK X DENGAN METODE LINEAR PROGRAMMING
1131-1136
Abstract : 63
|
PDF : 59
ANALISIS PERUBAHAN KUAT GESER PADA TANAH LEMPUNG DAN PASIR AKIBAT PENAMBAHAN FLY ASH TIPE C
1137-1144
Abstract : 38
|
PDF : 47
PERBANDINGAN NILAI KUAT GESER TANAH DENGAN KETEBALAN PEMADATAN 20 CM DAN 40 CM
1145-1150
Abstract : 32
|
PDF : 28
STUDI ANALISIS DAYA DUKUNG FONDASI DANGKAL PADA LERENG GALIAN
1151-1160
Abstract : 35
|
PDF : 28
PENGARUH PERENDAMAN TERHADAP NILAI KUAT UJI TEKAN YANG DIPADATKAN DENGAN CARA PROCTOR PADA BENGKOL
1161-1170
Abstract : 56
|
PDF : 31
TINJAUAN KEKUATAN LENTUR BALOK LEAN DUPLEX BERPENAMPANG HOLLOW BERLUBANG PADA TEMPERATUR TINGGI
1171-1182
Abstract : 42
|
PDF : 25
ANALISIS DAN KALIBRASI PARAMETER DRIVING BEHAVIOR PADA SIMPANG TAK BERSINYAL JALAN PERKOTAAN
1183-1192
Abstract : 167
|
PDF : 88
ANALISIS RISIKO PROYEK JARINGAN TRANSMISI DENGAN METODE DECISION TREE DAN EXPECTED MONETARY VALUE
1193-1206
Abstract : 63
|
PDF : 91
PENGARUH JARAK TEPI ANGKUR ADHESIF TERHADAP KAPASITAS TARIK DENGAN MIDAS FEA NX
1255-1268
Abstract : 43
|
PDF : 24
ESTIMASI KEBUTUHAN MATERIAL BETON STRUKTUR DAN BESI TULANGAN DENGAN METODE REGRESI MULTILINIER
1269-1276
Abstract : 48
|
PDF : 37
ANALISIS BIAYA KECELAKAAN LALU LINTAS MENGGUNAKAN METODA GROSS OUTPUT DI JALAN TABATOKI KABUPATEN POSO
1287-1294
Abstract : 69
|
PDF : 30
PENGARUH ANGKUTAN DARING (DALAM JARINGAN) TERHADAP PEMINAT ANGKUTAN KOTA
1295-1302
Abstract : 58
|
PDF : 34
PERENCANAAN TEBAL OVERLAY DAN ESTIMASI BIAYA PERBAIKAN JALAN DENGAN METODE BINA MARGA 2017 DAN 1987
1303-1314
Abstract : 106
|
PDF : 44
ANALISIS DAMPAK PENYEMPITAN JALAN TERHADAP KARAKTERISTIK LALU LINTAS JL. LETJEN ALAMSYAH RATU PRAWIRANEGARA
1315-1330
Abstract : 149
|
PDF : 68
ANALISIS DAMPAK LALU LINTAS AKIBAT PENGOPERASIAN HOTEL NOVOTEL MAKASSAR
1331-1344
Abstract : 50
|
PDF : 21
ANALISA KINERJA JALUR PEDESTRIAN DI JALAN RAYA UBUD
1345-1354
Abstract : 60
|
PDF : 29
EVALUASI KELAYAKAN INVESTASI ASPHALT MIXING PLANT (AMP) PADA PT XYZ (NABIRE, PAPUA TENGAH)
1355-1366
Abstract : 56
|
PDF : 45
ANALISIS PREDIKSI DURASI AKHIR PROYEK DENGAN METODE EARNED VALUE DAN EARNED SCHEDULE
1377-1388
Abstract : 40
|
PDF : 28
SUBTITUSI LIMBAH ABU SEKAM PADI PADA BETON SELF COMPACTING CONCRETE (SCC)
1389-1400
Abstract : 65
|
PDF : 38
PENGARUH UKURAN BENDA UJI KUBUS TERHADAP NILAI KUAT TEKAN RECATIVE POWDER CONCRETE
1401-1406
Abstract : 38
|
PDF : 43
ANALISIS PENGARUH EKSTRAKSI PERKUATAN GALIAN SEMENTARA PADA JALUR PIPA GAS BAWAH PERMUKAAN
1407-1416
Abstract : 48
|
PDF : 37