RANCANG BANGUN PEMBANGKIT LISTRIK TENAGA SURYA (PLTS) ON GRID DI ECOPARK ANCOL

Main Article Content

Albert Gifson Hutajulu
Masbah RT Siregar
Mohammad Priyo Pambudi

Abstract

Indonesia is a tropical area that has a very large amount of sunlight which is a potential renewable energy with an average daily irradiation of 4.5 - 4.8 kWh / m2.As a renewable energy, sunlight is not pollutant, will not run out, but is free or free.Therefore this energy source can be utilized for electricity through the Solar Power Plant (PLTS) system. This research will discuss the design of On Grid Solar Power Generation (PLTS) systems by generating 60% of the load capacity in the Learning Farm area.The power generated is 68.17 kWp using 100 solar cell modules. This PLTSis designed to reduce electricity consumption from PLN in Ancol Ecopark.This location is considered to have good solar radiation potential and a largeavailability of land. The results of this design are expected to be a referencefor the Ancol ecopark learning farm in order to obtain a good match between energy needs, price, and quality.

ABSTRAK:

Indonesia merupakan daerah tropis yang mempunyai sinar matahari yang sangat besar menjadi potensi energi terbarukan dengan iradiasi harian rata-rata 4,5 – 4,8 kWh/m2. Sebagai energi terbarukan, sinar matahari tidak bersifat polutif, tidak akan habis, namun bersifat gratis atau cuma-cuma. Maka dari itu sumber energi ini dapat dimanfaatkan untuk kelistrikan melalui sistem Pembangkit Listrik Tenaga Surya (PLTS). Pada penelitian ini akan dibahas perancangan sistem Pembangkit Listrik Tenaga Surya (PLTS)  On Grid dengan membangkitkan 60 % dari kapasitas beban di area Learning Farm. Besar daya yang dibangkitkan sebesar 68,17 kWp dengan menggunakan 100 modul sel surya. PLTS ini dirancang untuk mengurangi pemakaian listrik dari PLN di Ecopark Ancol. Lokasi ini dinilai memiliki potensi radiasi matahari yang cukup baik dan ketersediaan lahan yang luas. Hasil dari perancangan ini diharapkan menjadi acuan bagi pihak ecopark learning farm Ancol agar diperoleh kesesuaian antara kebutuhan energi, harga, dan kualitas yang baik

Article Details

How to Cite
[1]
A. G. Hutajulu, M. RT Siregar, and M. P. Pambudi, “RANCANG BANGUN PEMBANGKIT LISTRIK TENAGA SURYA (PLTS) ON GRID DI ECOPARK ANCOL”, TESLA, vol. 22, no. 1, pp. 23–33, Mar. 2020.
Section
Articles

References

I.W.G.A Anggara, I.N.S Kumara (2014). “Studi Terhadap Unjuk Kerja Pembangkit Listrik Tenaga Surya 1920 Watt Di Universitas Udayana Bukit Jimbaran”, E-Journal Spektrum Vol.1 No.1

Imaduddin Marie Gindo, Heri Suyanto “Studi Perencanaan On Grid Dengan Kapasitas 30 kWp Di Taman Wisata Angke Kapuk”, STTPLN, Oktober 2019.

Liu, Y.H., Liu, C.-L., Huang, J.-W.,& Chen, J–H. (2013). Neural-Network-Based Maximum Power Point Tracking Methods For Photovoltaic System Operation Under Fast Charging Environment. Solar Energy, 89, 42-53.

Dwi Ratna Ningsih,”Perencanaan Pembangkit Listrik Tenaga Surya Rooftop 30 kWp Di Gedung Bapeda Propinsi Kaltim”, STTPLN, Agustus 2016.

Fajri Hakim, "Perancangan Rooftop Off Grid Solar Panel Pada Rumah Tinggal Sebagai Alternatif Sumber Energi Listrik", Jurnal Politeknik Negeri Malang, 2017

Ramadhani Ing Bagus, "Instalasi Pembangkit Listrik Tenaga Surya, Dos and Don’t", Kementrian Energi dan Sumber Daya Mineral, 2018

Sianipar, Rafael. 2014. “Dasar Perencanaan Pembangkit Listrik Tenaga Surya”, Jurnal. Jakarta : Universitas Trisakti.

....., “Suneon Roman Tile roof mounting system”, www.suneonsolar.com , Diakses pada tanggal 27 Juli 2018 pukul 11.00 WIB