Main Navigation
Main Content
Sidebar
Register
Login
Toggle navigation
Current
Archives
Announcements
About
About the Journal
Submissions
Editorial Team
Reviewer
Privacy Statement
Contact
Search
Home
Archives
Vol. 7 No. 3 (2019): Jurnal Ilmiah Teknik Industri (Jurnal Keilmuan Teknik dan Manajemen Industri )
Published:
2020-01-16
Full Issue
DAFTAR ISI
EDITORIAL
COVER
Articles
ANALISIS KUALITAS PRODUK DRUM DAN METAL PACKAGING (STUDI KASUS: PLANT 1 PT GUNA SENAPUTRA SEJAHTERA)
Bintang Bagaskara K, Clara Puspita N, Stephen Alexander, Lithrone Laricha S
https://doi.org/10.24912/jitiuntar.v7i3.6998
Abstract : 689
|
DOWNLOAD : 540
DOWNLOAD
ANALISIS PERENCANAAN PRODUKSI PADA PT. ARMSTRONG INDUSTRI INDONESIA DENGAN METODE FORECASTING DAN AGREGAT PLANNING
Fristha Ayu Reicita
https://doi.org/10.24912/jitiuntar.v7i3.6340
Abstract : 12259
|
DOWNLOAD : 16889
DOWNLOAD
PERANCANGAN APLIKASI SISTEM E-PURCHASING DENGAN PENDEKATAN KONSEP VALUE MATRIX PADA PROSES PEMESANAN BAHAN BAKU PERUSAHAAN SPRINGBED
Carla Olyvia Doaly, Ahmad Ahmad, Erwin Tanuwijaya
https://doi.org/10.24912/jitiuntar.v7i3.6336
Abstract : 483
|
DOWNLOAD : 472
DOWNLOAD
ANALISIS USULAN PERANCANGAN TATA LETAK PABRIK DI CV. ATHAM TOYS
Mohammad Edo Setiawan, Ratu Siti Khodijah, Rizki Gema Ramadhan
https://doi.org/10.24912/jitiuntar.v7i3.6339
Abstract : 3632
|
DOWNLOAD : 3599
DOWNLOAD
ANALISIS LINE BALANCING PADA BAGIAN SUB FRAME MOTOR MATIC XXX MENGGUNAKAN METODE RANK POSITIONAL WEIGHT
Dimas Rangga Wardhana
https://doi.org/10.24912/jitiuntar.v7i3.7001
Abstract : 754
|
DOWNLOAD : 710
DOWNLOAD
ANALISIS PENGANGKATAN CPU DI WM GAME CENTER DENGAN METODE RECOMMENDED WEIGHT LIMIT (RWL) DAN CHAFFIN ANDERSON
Muhammad Noviandy
https://doi.org/10.24912/jitiuntar.v7i3.7004
Abstract : 1620
|
DOWNLOAD : 1751
DOWNLOAD
PENGENDALIAN PERSEDIAAN PRODUK DROP CABLE DI PROYEK INSTALASI KABEL RUMAH DAN MIGRASI JARINGAN AREA BANDUNG (STUDI KASUS : PT INTI PERSERO)
Agung Dera Pradana, Leni Herdiani, Rohmana Rohmana
https://doi.org/10.24912/jitiuntar.v7i3.6337
Abstract : 540
|
DOWNLOAD : 539
DOWNLOAD
PENJADWALAN FLOW SHOP MESIN PARALEL MENGGUNAKAN METODE LONGEST PROCESSING TIME DAN CROSS ENTROPY-GENETIC ALGORITHM PADA PEMBUATAN PRODUK STEEL BRIDGE B-60
Yusraini Muharni, Ade Irman Saeful M, Tania Ero Rubyanti
https://doi.org/10.24912/jitiuntar.v7i3.6338
Abstract : 1542
|
DOWNLOAD : 947
DOWNLOAD