MANAJEMEN PROYEK PERANCANGAN SISTEM INFORMASI UNTUK PENJUALAN ALAT KESEHATAN

Main Article Content

Asep Darmawan
Dedi Trisnawarman
Agus Budi Dharmawan

Abstract

This research aims to ensure the successful completion of an information system design project for the sale of medical devices by CV Star Ayres Indonesia, a company involved in medical device distribution. Utilizing project management theories such as Work Breakdown Structure, Gantt Chart, Network Diagram, Critical Path Method, PERT Diagram, Risk Management, and Cost Management, the study focuses on identifying, planning, organizing, controlling, and evaluating the project. The analysis reveals that the project will take approximately 211 days, as determined by network diagram calculations using the Critical Path Method and PERT Diagram, considering potential risks. Additionally, the estimated cost for the project is Rp. 69,884,000, covering labor, transportation, hosting, printing, consumption, and other administrative expenses.

Article Details

Section
Articles

References

[1] Usman, M., Shah, M., & Al-Ghamdi, A. S. (2019). The Impact of Information Technology on Business Growth and Performance: A Systematic Literature Review. International Journal of Innovative Technology and Exploring Engineering, 8(7), 2278-3075.

[2] Dairo, M., Adekola, J., Apostolopoulos, C., & Tsaramirsis, G. (2021). Benchmarking strategic alignment of business and IT strategies: opportunities, risks, challenges and solutions. International Journal of Information Technology, 1-17.

[3] Selay, A., Andgha, G.D., Alfarizi, M.A., Wahyudi, M.I.B., Falah, M.N., & Mulil, M.E. (2023). Sistem Informasi Penjualan Berbasis Web pada PT. Karimah Taufiq Sejahtera. Jurnal Karimah Taufiq Sejahtera, 1(1), 1-8.

[4] Selay, A., Kurniawan, A., & Sari, N. (2019). Sistem Informasi Penjualan. Karimah Tauhid, 2(1), 1-10.

[5] Rohmat, D. Z. (2018). Perancangan Sistem Informasi Penjualan Berbasis Web (Studi Kasus pada Newbiestore). Khatulistiwa Informatika, 6(2), 1-9.

[6] Siswanto, A.B. & Salim, M.A. (2020). Manajemen Proyek: Konsep dan Aplikasi. Penerbit Andi, Yogyakarta.

[7] Schwalbe, K. (2019). Information Technology Project Management. Cengage Learning, Boston.

[8] Atlassian. (2021). Waterfall Methodology for Project Management.

[9] Subekti, H. B., Yuliansyah, B., Devianty, F. A., Saleh, H. M., & Purnama, M. A. (2018). Manajemen Proyek dalam pembuatan Aplikasi Penyewaan Baju Adat Berbasis Website (Studi Kasus: Toko Gulo Merah). Seminar Nasional Informatika, Sistem Informasi Dan Keamanan Siber (SEINASI-KESI), 1(1), 1-6.

[10] Ahmad, N., Abdullah, N. H., & Zakaria, N. (2019). Project Management Techniques for Software Development. International Journal of Engineering and Technology, 8(1.8), 1-5.

[11] Patil, N. D., Patil, S. D., & Patil, S. S. (2015). Planning And Scheduling Of A Project Using Microsoft Project (msp). International Journal of Advanced Research, 3(9), 789-798.

[12] Organ, C., & Bottorff, C. (2022, March 25). Work breakdown structure (WBS) in project management. Forbes Advisor.

[13] Cicala, G. (2020). Developing a Work Breakdown Structure. Dalam G. Cicala (Ed.), Project Management with Dynamic Scheduling: Baseline Scheduling, Risk Analysis and Project Control.

[14] Hudoyo, C. P., Latief, Y., & Sagita, L. (2019). Development of WBS (Work Breakdown Structure) Risk Based Standard for Planning Cost Estimation at Port Project. IOP Conference Series: Earth and Environmental Science, 258(1), 012051.

[15] Kerzner, H. (2017). Project management: A systems approach to planning, scheduling, and controlling (12th ed.).

[16] Farzadnia, N., Khalid, N. H., & Heravi, G. (2019). Critical Path Method in Construction Projects: A Review of Practices and Challenges. International Journal of Civil Engineering and Technology, 10(2), 100-113.

[17] Khan, A., & Mir, M. S. (2019). Critical path method (CPM). In Project Management: Concepts, Methodologies, Tools, and Applications (pp. 1-14). IGI Global.

[18] Wasito, & Syaikhudin, A. Y. (2019). Studi Penerapan Critical Path Metode (CPM) pada Proyek Pembangunan Pabrik Semen Rembang PT Semen Gresik. Jurnal Ekonomi dan Bisnis, 22(1), 1-16.

[19] Team Asana. (2021). A three-point estimating technique: PERT. Project Management Academy.

[20] Putra, G.J.E., Setiawan, I.K., & Lodinata, I.W.A.S. (2021). Manajemen Proyek Teknologi Informasi Pengembangan Website UMKM PMAM Bali. SMART TECHNO (Smart Technology, Informatic, and Technopreneurship), 3(1), 13-23.

[21] Sari, R. A., & Sari, D. A. (2020). Pengaruh Kepemimpinan Transformasional dan Motivasi Kerja Terhadap Kinerja Karyawan PT. Bank Mandiri (Persero) Tbk. Cabang Cikarang. Seminar Nasional Inovasi dan Kewirausahaan (SEINASIKESI), 1(1), 1-10.