Diterbitkan: 2017-08-01

Cover

Admin Admin

i

https://doi.org/10.24912/poros.v12i1.674
Abstrak : 282 | PDF (English) : 132

Daftar Isi

Admin Admin

iii

https://doi.org/10.24912/poros.v12i1.676
Abstrak : 262 | PDF (English) : 153

DINAMIKA KENDARAAN JALAN LURUS 3 PADA GEROBAK LISTRIK PENGANGKUT SAMPAH KAPASITAS 2 m3

Edward Suhartono, G Soeharsono, Danardono Agus Sumarsono

18-24

https://doi.org/10.24912/poros.v12i1.679
Abstrak : 410 | PDF (English) : 478

PERANCANGAN POWERTRAIN PADA SEGWAY

Agustinus Purna Irawan, Agustinus Purna Irawan, Danardono Agus Sumarsono

35-40

https://doi.org/10.24912/poros.v12i1.681
Abstrak : 336 | PDF (English) : 332

STRESS ANALYSIS PADA HORIZONTAL AXIS WIND TURBINE BLADE

Achmad Rachmad Tullah, Made K Dhiputra, G Soeharsono

41-45

https://doi.org/10.24912/poros.v12i1.682
Abstrak : 378 | PDF (English) : 352

PERANCANGAN KONSTRUKSI PADA SEGWAY

Alvin Soesilo, Agustinus Purna Irawan, Frans Jusuf Daywin

46-51

https://doi.org/10.24912/poros.v12i1.683
Abstrak : 282 | PDF (English) : 280

ANALISIS KEKUATAN DAN STABILITAS STRUKTUR SISTEM PARKIR OTOMATIS BERBANTUAN SOFTWARE

Eko Reinaldo, Agustinus Purna Irawan, Frans Jusuf Daywin

52-57

https://doi.org/10.24912/poros.v12i1.684
Abstrak : 320 | PDF (English) : 350

RANCANG BANGUN ROBOT KRI 2012

Andreas Hadi, Agus Halim, Noor Eddy

74-79

https://doi.org/10.24912/poros.v12i1.687
Abstrak : 416 | PDF (English) : 338

PERANCANGAN SISTEM ANGKAT FORKLIFT DENGAN KAPASITAS ANGKAT 7 TON

Jimmy Jimmy, Frans Jusuf Daywin, G Soeharsono

87-94

https://doi.org/10.24912/poros.v12i1.689
Abstrak : 1492 | PDF (English) : 1847