Diterbitkan: 2017-08-01

Cover

Admin Admin

i

https://doi.org/10.24912/poros.v12i1.674
Abstrak : 295 | PDF (English) : 141

Daftar Isi

Admin Admin

iii

https://doi.org/10.24912/poros.v12i1.676
Abstrak : 272 | PDF (English) : 164

DINAMIKA KENDARAAN JALAN LURUS 3 PADA GEROBAK LISTRIK PENGANGKUT SAMPAH KAPASITAS 2 m3

Edward Suhartono, G Soeharsono, Danardono Agus Sumarsono

18-24

https://doi.org/10.24912/poros.v12i1.679
Abstrak : 439 | PDF (English) : 510

PERANCANGAN POWERTRAIN PADA SEGWAY

Agustinus Purna Irawan, Agustinus Purna Irawan, Danardono Agus Sumarsono

35-40

https://doi.org/10.24912/poros.v12i1.681
Abstrak : 357 | PDF (English) : 349

STRESS ANALYSIS PADA HORIZONTAL AXIS WIND TURBINE BLADE

Achmad Rachmad Tullah, Made K Dhiputra, G Soeharsono

41-45

https://doi.org/10.24912/poros.v12i1.682
Abstrak : 402 | PDF (English) : 372

PERANCANGAN KONSTRUKSI PADA SEGWAY

Alvin Soesilo, Agustinus Purna Irawan, Frans Jusuf Daywin

46-51

https://doi.org/10.24912/poros.v12i1.683
Abstrak : 293 | PDF (English) : 306

ANALISIS KEKUATAN DAN STABILITAS STRUKTUR SISTEM PARKIR OTOMATIS BERBANTUAN SOFTWARE

Eko Reinaldo, Agustinus Purna Irawan, Frans Jusuf Daywin

52-57

https://doi.org/10.24912/poros.v12i1.684
Abstrak : 339 | PDF (English) : 371

RANCANG BANGUN ROBOT KRI 2012

Andreas Hadi, Agus Halim, Noor Eddy

74-79

https://doi.org/10.24912/poros.v12i1.687
Abstrak : 443 | PDF (English) : 354

PERANCANGAN SISTEM ANGKAT FORKLIFT DENGAN KAPASITAS ANGKAT 7 TON

Jimmy Jimmy, Frans Jusuf Daywin, G Soeharsono

87-94

https://doi.org/10.24912/poros.v12i1.689
Abstrak : 1522 | PDF (English) : 1872