Published: 2017-08-01

Cover

Admin Admin

i

https://doi.org/10.24912/poros.v12i1.674
Abstract : 269 | PDF : 122

Daftar Isi

Admin Admin

iii

https://doi.org/10.24912/poros.v12i1.676
Abstract : 246 | PDF : 146

PERANCANGAN POWERTRAIN PADA SEGWAY

Agustinus Purna Irawan, Agustinus Purna Irawan, Danardono Agus Sumarsono

35-40

https://doi.org/10.24912/poros.v12i1.681
Abstract : 325 | PDF : 322

STRESS ANALYSIS PADA HORIZONTAL AXIS WIND TURBINE BLADE

Achmad Rachmad Tullah, Made K Dhiputra, G Soeharsono

41-45

https://doi.org/10.24912/poros.v12i1.682
Abstract : 358 | PDF : 345

PERANCANGAN KONSTRUKSI PADA SEGWAY

Alvin Soesilo, Agustinus Purna Irawan, Frans Jusuf Daywin

46-51

https://doi.org/10.24912/poros.v12i1.683
Abstract : 273 | PDF : 269

RANCANG BANGUN ROBOT KRI 2012

Andreas Hadi, Agus Halim, Noor Eddy

74-79

https://doi.org/10.24912/poros.v12i1.687
Abstract : 400 | PDF : 326

PERANCANGAN SISTEM ANGKAT FORKLIFT DENGAN KAPASITAS ANGKAT 7 TON

Jimmy Jimmy, Frans Jusuf Daywin, G Soeharsono

87-94

https://doi.org/10.24912/poros.v12i1.689
Abstract : 1475 | PDF : 1832