Published: 2017-08-01

Cover

Admin Admin

i

https://doi.org/10.24912/poros.v12i1.674
Abstract : 288 | PDF : 135

Daftar Isi

Admin Admin

iii

https://doi.org/10.24912/poros.v12i1.676
Abstract : 269 | PDF : 158

PERANCANGAN POWERTRAIN PADA SEGWAY

Agustinus Purna Irawan, Agustinus Purna Irawan, Danardono Agus Sumarsono

35-40

https://doi.org/10.24912/poros.v12i1.681
Abstract : 349 | PDF : 338

STRESS ANALYSIS PADA HORIZONTAL AXIS WIND TURBINE BLADE

Achmad Rachmad Tullah, Made K Dhiputra, G Soeharsono

41-45

https://doi.org/10.24912/poros.v12i1.682
Abstract : 390 | PDF : 361

PERANCANGAN KONSTRUKSI PADA SEGWAY

Alvin Soesilo, Agustinus Purna Irawan, Frans Jusuf Daywin

46-51

https://doi.org/10.24912/poros.v12i1.683
Abstract : 289 | PDF : 291

RANCANG BANGUN ROBOT KRI 2012

Andreas Hadi, Agus Halim, Noor Eddy

74-79

https://doi.org/10.24912/poros.v12i1.687
Abstract : 431 | PDF : 347

PERANCANGAN SISTEM ANGKAT FORKLIFT DENGAN KAPASITAS ANGKAT 7 TON

Jimmy Jimmy, Frans Jusuf Daywin, G Soeharsono

87-94

https://doi.org/10.24912/poros.v12i1.689
Abstract : 1504 | PDF : 1854