PENILAIAN RISIKO KEGAGALAN BENDUNGAN KEDUNGOMBO SEBAGAI DASAR PRIORITAS PEMELIHARAAN BENDUNGAN

Main Article Content

Rais Buldan
Suharyanto Suharyanto
Sriyana Sriyana

Abstract

A dams must always be maintained for their performance, function, and safety, so it is necessary to carry out various maintenance, repairs, and rehabilitation on dams that have been built and operating. Priority systems for the implementation of repair and rehabilitation of dams can be arranged based on the status of safety hazards or the level of risk of failure due to natural disasters or other consequences. Based on this, it is necessary to carry out an assessment of the dam to estimate the magnitude of the risk to the dam. According to the Risk Analysis Guidelines, the estimation of the probability of failure can be done using two methods, namely the traditional method and the event tree method. Based on the results of assessment analysis, the risk probability of the Kedungombo Dam with the traditional method and the event tree method is 4,010 x 10-1 and 1,548 x 10-3 where the acceptable limit conditions for the existing dam are a maximum of 1,000 x 10-5. The risk probability value of the Kedungombo Dam does not meet the requirements of an acceptable risk value. Therefore, it is necessary to recommend risk reduction for the risk assessment results.

 

ABSTRAK

Bendungan harus selalu dijaga kinerja operasi, fungsi, dan keamanannya, sehingga perlu dilakukan berbagai kegiatan pemeliharaan, perbaikan, dan rehabilitasi pada bendungan yang sudah terbangun dan beroperasi. Sistem prioritas pada pelaksanaan kegiatan perbaikan dan rehabilitasi pada bendungan dapat disusun berdasarkan status bahaya bendungan dari segi keamanan atau besarnya risiko terhadap kegagalan bendungan akibat bencana alam maupun akibat lain. Berdasarkan hal tersebut, maka perlu dilakukan penilaian risiko pada bendungan untuk memperkirakan besarnya risiko bahaya pada bendungan. Berdasarkan Pedoman Analisis Risiko, perkiraan probabilitas kegagalan dapat dilakukan dengan dua metode yaitu metode tradisional dan metode pohon kejadian (event tree). Berdasarkan hasil analisis penilaian risiko, probabilitas risiko Bendungan Kedungombo metode tradisional dan metode pohon kejadian sebesar 4,010 x 10-1 dan 1,548 x 10-3 dimana syarat batas yang dapat diterima untuk bendungan eksisting maksimum 1,000 x 10-5. Nilai probabilitas risiko Bendungan Kedungombo tidak memenihi syarat nilai risiko yang dapat diterima. Dengan demikian, diperlukan rekomendasi tindakan pengurangan risiko untuk risiko hasil penilaian tersebut.

 

Article Details

Section
Articles

References

BBWS Pemali Juana. (2012). Laporan Inspeksi Besar Bendungan Kedungombo. Kementerian PUPR. Semarang.

BBWS Pemali Juana. (2017). Laporan Rencana Tindak Darurat Bendungan Kedungombo. Kementerian PUPR. Semarang.

Chen, Y., & Lin, P. (2018). The Total Risk Analysis Of Large Dams Under Flood Hazards. Water (Switzerland), 10(2).

Dwi Y., C., Juwono, P. T., & Yuliani, E. (2016). Analisis Probabilitas Risiko Kegagalan Bendungan Gerokgak Berdasarkan Metode Pohon Kejadian (Event Tree). Jurnal Teknik Pengairan, 7, 7–16.

Fluixá-Sanmartín, J., Escuder-Bueno, I., Morales-Torres, A., dan Castillo-Rodríguez, J. T. (2020). Comprehensive Decision-Making Approach For Managing Time Dependent Dam Risks. Reliability Engineering And System Safety, 203.

Indrawan, D. (2013). Penilaian Indeks Risiko Metode Modifikasi Andersen Dan Modifikasi ICOLD Untuk 12 Bendungan Di Pulau Jawa. Jurnal Sumber Daya Air. 9(2), 93–102.

Kementerian PU. (2011). Pedoman Teknis Penilaian Risiko. Jakarta.

Pramudawati M. A. H., Mahdi I.T., Ranisa G. (2020). Penilaian Risiko Keamanan Bendungan Di Jawa Timur. Jurnal Teknik Hidraulik, 11(2), 93–102.

Pemerintah Republik Indonesia (2007). Undang-Undang Republik Indonesia Nomor 24 Tahun 2007 tentang Penanggulangan Bencana.

Pemerintah Republik Indonesia (2008). Peraturan Pemerintah Nomor 21 Tahun 2008 tentang Penyelenggaraan Penanggulangan Bencana.

Sheng, J., Li, D., Cai, Q., & Peng, X. (2018). Research progress and its practice of key techniques for dam risk assessment and management, Journal SCIENTIA SINICA, 48(10), 1057-1067

Soentoro, E. A., Purnomo, A. B., & Susantin, S. H. (2013). Study on Dam Risk Assessment as a Decision-Making Tool to Assist Prioritizing Maintenance of Embankment Dam. The 2nd International Conference on SIBE. 205-219.