ANALISIS DINDING PENAHAN TANAH DI DAERAH ALIRAN SUNGAI MENGGUNAKAN PROGRAM MIDAS GTS NX

Main Article Content

James Bastian Halim
Chaidir Anwar Makarim

Abstract

A retaining wall at a river bend in Depok cannot hold the soil behind the wall that cause the wall collapses and the soil landslide. The retaining wall is using shallow foundation. Therefore, a new wall is needed to prevent the land from sliding. The research method was using finite element method and Midas GTS NX program using 1 boring log data, 40cmx40cm for pole size and three types of walls with different capping beam size. In this analysis, the value of L2 is smaller than L1, which indicated an unusual thing, in general the value of L2 is equal or greater than L1, L1 is length of the free pole and L2 is length of the pole through the ground surface. The value of L1 can increase due to the river currents that erode riverbeds. The analysis showed the three types of walls has fulfilled the maximum limit of lateral deformation 8.4cm and maximum limit moment from the brochure 224.2kNm. From the three types of wall, type 1 wall is selected with displacement value of 2.454cm and a maximum moment of 116.592kNm. Type 1 wall were chosen because it require a minimum cost of Rp 458.821.479,072 less than other types.

 

Dinding penahan tanah disebuah tikungan sungai di Depok tidak dapat menahan tanah yang berada di belakangnya sehingga dinding tersebut roboh dan menyebabkan tanah di belakang dinding longsor. Dinding penahan tanah tersebut didesain dengan menggunakan pondasi dangkal. Oleh karena itu, diperlukan dinding penahan tanah yang baru dengan menggunakan tiang pancang untuk mencegah tanah tersebut longsor lagi. Metode penelitian dilakukan dengan menggunakan metode elemen hingga dengan bantuan program Midas GTS NX dengan menggunakan 1 data boring log, ukuran tiang 40cmx40cm dan tiga tipe dinding dengan ukuran capping beam yang berbeda. Dalam analisa ini, besarnya nilai L2 lebih kecil dari L1 yang menunjukkan hal tidak lazim yang pada umumnya besarnya nilai L2 sama atau lebih besar dari L1 dimana L1 merupakan panjang tiang bebas dan L2 merupakan panjang tiang menembus permukaan tanah. Besarnya nilai L1 dapat meningkat akibat adanya arus sungai yang menggerus dasar sungai. Hasil analisa menunjukkan ketiga tipe dinding telah memenuhi syarat batas maksimum deformasi lateral dinding sebesar 8.4cm dan batas maksimum momen dari brosur 224.2kNm. Dari ketiga tipe dinding tersebut dipilih dinding tipe 1 dengan nilai displacement sebesar 2.454cm dan momen maksimum 116.592kNm. Dinding tipe 1 dipilih karena membutuhkan biaya paling minimum sebesar Rp 458.821.479,072 lebih kecil dibandingkan dengan tipe lainnya.

Article Details

Section
Articles

References

Ameratunga, Jay, Nagaratnam Sivakugan and Braja Das. Correlations of Soil and Rock Properties in Geotechnical Engineering. India: Springer, 2015.

Ankita. 14-485 Capstone Geotechnical Module. 17 September 2019. 10 Maret 2020. <https://www.scribd.com/document/426219857/14-485capstonegeotechnicalmodule-pdf>.

Badan Standarisasi Nasional. Persyaratan Perencanaan Geoteknik (SNI 8460:2017). Jakarta: BSN 2017, 2017.

Beton, PT Wijaya Karya. PC Piles. 14 November 2017. 5 May 2020. <https://www.wika-beton.co.id/uploads/2-PC-PILES.pdf>.

Bowles, Joseph E. Analisis dan Disain Pondasi, Jilid 1. Jakarta: Erlangga, 1997.

Budhu, Muni. Soil Mechanics and Foundation. United States of America: John Wiley and Sons, 2000.

Dhamdhere, D. R., Dr. V.R. Rathi and Dr. P.K. Kolase. "Design And Analysis Of Retaining Wall." International Journal Of Management, Technology And Engineering (2018).

Gouw, Tjie Liong. Ground Settlement. Jakarta, 2009.

Hamdhan, Indra Noer and Desti Santi Pratiwi. "Analisis Stabilitas Lereng Dalam Penanganan Longsoran di Jalan Tol Cipularang Km. 91+200 dan Km. 92+600 Menggunakan Metode Elemen Hingga (FEM)." (2017).

Leonsius, Calvin. "Analisis Dinding Perkuatan Tanah Dengan Georid Menggunakan Metode Satu Baji (Single Wedge Method) Dan Dua Baji (Two Part Wedge Method)." (2012).

Munawars, Andi. Analisis Beton K-500. 11 November 2015. 15 May 2020. <https://www.scribd.com/doc/289345883/Analisis-Beton-K-500>.

Preacast, PT Gemilan Beton. Harga Square Pile. 11 February 2016. 16 May 2020. <http://gemilanbetonprecast.blogspot.com/search?updated-max=2016-02-11T23:52:00-08:00&max-results=7&m=0>.

Sabina, Novia. "Proses Analisis Dinding Galian Basement 7 lantai dengan Metode Elemen Hingga." JMTS: Jurnal Mitra Teknik Sipil Vol. 3, No. 1 (2020): 49-58.