STUDI PERBANDINGAN PONDASI TIANG PANCANG DAN TIANG BOR DITINJAU DARI BIAYA DAN PRODUKTIVITAS TENAGA KERJA

Main Article Content

Sri Aliane Rahayu Ningsih
Agustinus Agus Setiawan
Rizka Arbaningrum

Abstract

The foundation is a sub structure element of a construction which has the function of distributing the load of the upper structure to the hard soil layer. This research has an objective to analyze the effectiveness of pile and drilled pile foundations in terms of costs and labor productivity. As a case study, the research object was taken from the implementation of the foundation structure of "X" Hospital in South Jakarta. In this research, a comparison was made regarding the choice of foundation types, between D40 cm pile foundations with a length of 18m, drilled pile foundations D60, and D80, each with a length of 20m. Based on the analysis of construction costs and time, the results show that the implementation of a D40 cm pile foundation is the most economical at a cost of Rp. 5,211,225,400.00 with a work duration of 53 days, drilled pile foundations for D60 require a cost of Rp. 6,116,965,139.00 (17.38% higher) with a work duration of 86 days, and the D80 drilled pile foundation requires a cost of Rp. 6,935,678,499.00 (33.1% higher than piles) with a work duration of 98 days. In terms of labor productivity, pile foundations are lower than drilled pile foundations.


Keywords: budget; productivity; labor; pile foundation; bored pile


Abstrak


Pondasi merupakan unsur struktur bawah dari suatu konstruksi yang memiliki fungsi menyalurkan beban struktur atas ke lapisan tanah keras. Penelitian ini bertujuan untuk menganalisis efektifitas dari pondasi tiang pancang dan tiang bor ditinjau dari segi biaya dan produktivitas tenaga kerja. Sebagai bahan studi kasus, obyek penelitian diambil dari pelaksanaan struktur pondasi Rumah Sakit ”X” di Jakarta Selatan. Dalam penelitian ini dilakukan perbandingan pemilihan jenis pondasi, antara pondasi tiang pancang D40 cm dengan panjang 18m, pondasi tiang bor D60, dan D80 yang masing-masing memiliki panjang 20m. Berdasarkan analisis biaya dan waktu konstruksi diperoleh hasil bahwa pelaksanaan pondasi tiang pancang D40 cm adalah yang paling ekonomis dengan biaya sebesar Rp. 5.211.225.400,00 dengan durasi pekerjaan selama 53 hari, pondasi tiang bor untuk D60 membutuhkan biaya sebesar Rp. 6.116.965.139,00 (lebih tinggi 17,38%) dengan durasi pekerjaan selama 86 hari, dan pondasi tiang bor D80 membutuhkan biaya sebesar Rp. 6.935.678.499,00 (lebih tinggi 33,1% dari tiang pancang) dengan durasi pekerjaan selama 98 hari. Dari segi produktivitas tenaga kerja, fondasi tiang pancang lebih rendah dibandingkan dengan fondasi tiang bor.

Article Details

Section
Articles

References

Arvianto, R., Handayani, F.S., Setiono. (2016). ”Optimasi Biaya Dan Waktu Dengan Metode Time Cost Trade Off (Tcto)(Studi Kasus Proyek Bangunan Rawat Inap Kelas III Dan Parkir RSUD Dr. Moewardi Surakarta)”. Jurnal Matriks Teknik Sipil, 5(1), 69-74.

Basari, K., Pradipta, R. Y., Hatmoko, J. U. D., & Hidayat, A. (2014). ”Analisa Koefisien Produktivitas Tenaga Kerja Pada Pekerjaan Pembesian”. Jurnal Karya Teknik Sipil, 3(4), 830-839.

Das, B.M. (1983). Principles of Foundation Engineering 7th Edition. London: Cengage Learning

Fajar, M. (2022). Analisis Perbandingan Rencana Anggaran Biaya Berdasarkan SNI 2016 Dengan SNI 2018 (Studi Empiris Pembangunan Gedung Panggung Ruang Terbuka Publik Rantau Baru Kabupaten Tapin). Disertasi Doktor, Universitas Islam Kalimantan Muhammad Arsyad Al Banjari Banjarmasin.

Fardila, Dinda & Adwayah, N. R (2021). “Optimasi Biaya dan Waktu Proyek Konstruksi dengan Lembur dan Penambahan Tenaga Kerja”. Jurnal Inersia, Vol 17(1). doi: 10.21831/inersia.v17i1.39499

Fitriyandi, A. (2017). ”Analisis Produktivitas Tenaga Kerja Bangunan Struktur Bawah (Studi Kasus Pembangunan Icon City Blok C Cikarang)”. Jurnal Online Mahasiswa (JOM) Bidang Teknik Sipil, 1(1).

Gunawan, R. (1991). Pengantar Teknik Pondasi. Yogyakarta: Penerbit Kanisius.

Hardiyatmo, H.C. (2010). Analisis dan Perancangan Fondasi II Edisi Kedua. Yogyakarta: Gadjah Mada University Press.

Mayangsari. (2018). Analisis Perbandingan Pondasi Tiang Pancang Dengan Pondasi Tiang Bor Pada Proyek Pembangunan Rumah Sakit Gigi Dan Mulut Universitas Brawijaya. Skripsi. Fakultas Teknik Universitas Brawijaya, Malang.

Muluk, M., Hamid, D., & Santi, M. (2020). “Studi Perbandingan Pondasi Tiang Pancang dengan Pondasi Bore Pile (Studi Kasus: Pelaksanaan Pembangunan Fondasi Tower Grand Kamala Lagoon-Bekasi)”. Jurnal Teknik Sipil ITP, 7(1), 26-33.

Putra, S.A.P. (2018). Optimasi Biaya Dan Waktu Proyek Konstruksi Dengan Penambahan Jam Kerja (Lembur). Skripsi. Fakultas Teknik Universitas Islam Indonesia. Yogyakarta.