SIMULASI MONTE CARLO DALAM OPTIMASI BIAYA PEMELIHARAAN
Main Article Content
Abstract
Article Details
All publications by Jurnal Ilmiah Teknik Indsutri (Jurnal Keilmuan Teknik dan Manajemen Industri ) [p-ISSN: 2337-5841, e-ISSN: 2355-6528] is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
References
Anderson, T. W. (2010). Anderson darling Tests of Goodness-of-Fit. USA: Stanford University.
Anderson, T. W. & Darling, D. A. (1954). A Test of Goodness-of-Fit. Journal of American Statistical Association, 49(268), 765-769.
Ahmad, Kosasih, W. & Wijoyo, B. (2014). Penentuan Jadwal Penggerindaan pada Mata Pahat Mesin Giling dan Penggantian Mata Gerinda dengan Menggunakan Metode Preventive Maintenance. Jurnal Kajian Teknologi, 10(2), 73-82.
Corder, A.S. (1997). Teknik Manajemen Pemeliharaan. Jakarta, ID: Erlangga.
Dhillon, B.S. (2002). Engineering Maintenance: A Modern Approach. Boca Raton, USA: CRC Press.
Duc, L.M. & Ming, T.C. (2011). Cost Comparison of Maintenance Policies. Paper presented at Annual Conference of the Prognostics and Health Management Society 2011, Montreal, Quebec, Canada. New York, USA: PHM Society.
Ebeling, Charles E. (1997). An Introduction to Reliability and Maintainability Engineering. New York, USA: McGraw-Hill. 6.
Febrianti, W. & Soepangkat, B.O.P. (2016). Penentuan Interval Waktu Pemeliharaan Pencegahan pada Peralatan Sub Unit Sintesa Unit Urea di PT X Menggunakan Simulasi Monte Carlo. Paper presented at Seminar Nasional Manajemen Teknologi XXIV, Surabaya. Surabaya, ID: Program Studi MMT-ITS.
Jardine, A.K.S. (1973). Maintenance, Replacement, and Reliability. London, UK: Sir Issac Pitman and Sons Ltd.
Kosasih, W., Ahmad & Nurtanti, W. (2014). Pemeliharaan Terencana: Penjadwalan Interval Pembersihan Nozzle dan Penggantian Nozzle Heater pada Mesin Automatic Injection Molding E-110B (Studi Kasus: Perusahaan Guna Plast). Paper presented at 2nd Indonesian Statistical Analysis Conference, Bandung (pp. 211-214). Bandung, ID: Jurusan Teknik Industri Universitas Parahyangan.
Lyonnet, P. (1991). Maintenance Planning: Methods and Mathematics. London: Chapman and Hall.
Mustaqim, F., Kosasih, W. & Ahmad. (2020). Pemeliharaan Mesin Hydraulic Shear Menggunakan Pendekatan Reliability Centered Maintenance dan Manajemen Suku Cadang. Jurnal Rekayasa Sistem Industri, 9(3), 153-162.
O’Connor, Patrick & Kleyner, A. (2012). Practical Reliability Engineering. Fifth Edition. New York, USA: John Wiley & Sons Inc.
Soesetyo, I. & Bendatu, L.Y. (2014). Penjadwalan Predictive Maintenance dan Biaya Pemeliharaan Mesin Pellet di PT Charoen Pokphand Indonesia–Sepanjang. Jurnal Tirta, 2(2), 147-154.
Witjaksono, A. & Soepangkat, B.O.P. (2016). Penentuan Interval waktu Pemeliharaan Pencegahan pada Peralatan di Medium Pressure Gas Compression Area (MPGCA) di PT Texi Menggunakan Simulasi Monte Carlo. Paper presented at Seminar Nasional Manajemen Teknologi XXIV, Surabaya (pp. 1-8). Surabaya, ID: Program Studi MMT-ITS.
Zio, Enrico. (2013). The Monte Carlo Simulation Method for System Reliability and Risk Analysis. London, UK: Springer.