• Main Navigation
  • Main Content
  • Sidebar
JMTS: Jurnal Mitra Teknik Sipil
  • Login
  • ⌂ Site
  • ⌂ Home
  • Current
  • Archives
  • Announcements
  • About
    • About the Journal
    • Submissions
    • Editorial Team
    • Reviewer Team
    • Privacy Statement
    • Contact

Search

Advanced filters

Search Results

ANALISIS VARIABEL PENGURANGAN BIAYA OVERHEAD LAPANGAN YANG DOMINAN PADA PROYEK KONSTRUKSI GEDUNG BERTINGKAT DI JAKARTA

DOI : 10.24912/jmts.v2i2.4292
Calvin Christian , Basuki Anondho
page 35-44
Abstract : 477 | PDF : 1907
DOI : 10.24912/jmts.v2i2.4292

MINIMALISASI BIAYA PENYEDIAAN FRAME SCAFFOLDING DENGAN METODE LINEAR PROGRAMMING PADA PROYEK X

DOI : 10.24912/jmts.v3i2.6979
Verian Fernando Christanto , Iwan B. Santoso
page 255-266
Abstract : 327 | PDF : 1225
DOI : 10.24912/jmts.v3i2.6979

ANALISIS BIAYA PELAKSANAAN PROYEK KONSTRUKSI GEDUNG BERTINGKAT DENGAN KONSEP KONSTRUKSI HIJAU

DOI : 10.24912/jmts.v3i2.7051
Clara Alverina , Jane Sekarsari Tamtana
page 245-254
Abstract : 999 | PDF : 1928
DOI : 10.24912/jmts.v3i2.7051

KAJIAN EFISIENSI PERENCANAAN PC-I GIRDER DENGAN MENGGUNAKAN SISTEM STRAND 0,5” DAN 0,6” TERHADAP KEKUATAN DAN BIAYA

DOI : 10.24912/jmts.v3i1.6930
Jessen Richarlim , Edison Leo
page 11-18
Abstract : 285 | PDF : 1002
DOI : 10.24912/jmts.v3i1.6930

ANALISIS PENGARUH KETERLAMBATAN PROYEK TERHADAP ESTIMASI BIAYA DAN WAKTU PENYELESAIAN PROYEK X DI SAWANGAN

DOI : 10.24912/jmts.v8i1.32613
Antonius Erick Susanto , Henny Wiyanto
Abstract : 437 | PDF : 288
DOI : 10.24912/jmts.v8i1.32613

PENGARUH FAKTOR KARAKTERISTIK DEMOGRAFI TERHADAP BIAYA PROYEK INFRASTRUKTUR DESA TERTINGGAL

DOI : 10.24912/jmts.v3i1.7026
Pieter Geni , Basuki Anondho
page 215-222
Abstract : 336 | PDF : 1086
DOI : 10.24912/jmts.v3i1.7026

ANALISIS KOEFISIEN PEKERJAAN PEMBESIAN PADA KONSTRUKSI GEDUNG BERTINGKAT

DOI : 10.24912/jmts.v3i4.8393
Eric Leonardy , Jane Sekarsari
page 1327-1334
Abstract : 553 | PDF : 791 Analisis Koefisien Pekerjaan Pem : 34
DOI : 10.24912/jmts.v3i4.8393

PENGARUH CHANGE ORDER TERHADAP BIAYA, MUTU, DAN WAKTU PADA PROYEK KONSTRUKSI GEDUNG BERTINGKAT

DOI : 10.24912/jmts.v3i4.8233
Hendy Eka Putra , Hendrik Sulistio
page 1349-1362
Abstract : 1591 | PDF : 1403
DOI : 10.24912/jmts.v3i4.8233

PERENCANAAN TEBAL OVERLAY DAN ESTIMASI BIAYA PERBAIKAN JALAN DENGAN METODE BINA MARGA 2017 DAN 1987

DOI : 10.24912/jmts.v7i4.29046
Dwi Ayu Lestari Dwi Ayu Lestari , Akhmad Hasanuddin , Tatang Maulana Maliq
page 1303-1314
Abstract : 267 | PDF : 101
DOI : 10.24912/jmts.v7i4.29046

PENYEBAB SISA MATERIAL PADA PROYEK PEMBANGUNAN RUMAH TINGGAL X DI SERANG

DOI : 10.24912/jmts.v7i3.30776
Caesar Dasha Prameswara , Mega Waty
page 997-1004
Abstract : 212 | PDF : 140
DOI : 10.24912/jmts.v7i3.30776

ANALISIS WAKTU DAN BIAYA PERCEPATAN PROYEK BERDASARKAN WAKTU LEMBUR

Maritza Hayfa Maulidiani Haris , Henny Wiyanto
page 711-722
Abstract : 261 | PDF : 153

PERINGKAT FAKTOR-FAKTOR YANG MEMPENGARUHI TERJADINYA COST OVERRUN PADA PROYEK KONSTRUKSI PADA MASA PANDEMI COVID-19

DOI : 10.24912/jmts.v5i3.20258
Vincent Andian , Mega Waty
page 671-680
Abstract : 179 | PDF : 227
DOI : 10.24912/jmts.v5i3.20258

PENGHEMATAN BIAYA PEMBANGUNAN GEDUNG DIPO CENTER DENGAN MUTU BETON BERBEDA

DOI : 10.24912/jmts.v8i1.32635
Evan Suryana Laurensius , Mega Waty
Abstract : 121 | PDF : 114
DOI : 10.24912/jmts.v8i1.32635

OPTIMALISASI BIAYA PEMBANGUNAN STRUKTUR DINDING PENAHAN TANAH DENGAN REVETMENT WALL SEBAGAI PERIMETER PERUMAHAN X

DOI : 10.24912/jmts.v8i1.32630
Hauwendy Hauwendy , Arianti Sutandi
Abstract : 137 | PDF : 133
DOI : 10.24912/jmts.v8i1.32630
1 - 14 of 14 items

Registrasi

Registrasi

Template

Template

tools

Tools

Plagiarism Tool

 Reference Management Tool, download here

Related image

Use APA Style, download here

 

sinta

Akreditasi

DESKRIPSI GAMBAR

AuthorNotice

Author Notice

Ethical Statement

 

 Authorship Agreement

 

 Copyright Transfer

More information about the publishing system, Platform and Workflow by OJS/PKP.