• Main Navigation
  • Main Content
  • Sidebar
  • Login

  • Current
  • Archives
  • Announcements
  • About
    • About the Journal
    • Submissions
    • Editorial Team
    • Reviewer Team
    • Privacy Statement
    • Contact

Search

Advanced filters

Search Results

ANALISIS VARIABEL PENGURANGAN BIAYA OVERHEAD LAPANGAN YANG DOMINAN PADA PROYEK KONSTRUKSI GEDUNG BERTINGKAT DI JAKARTA

Calvin Christian, Basuki Anondho

35-44

https://doi.org/10.24912/jmts.v2i2.4292
Abstract : 469 | PDF : 1887

MINIMALISASI BIAYA PENYEDIAAN FRAME SCAFFOLDING DENGAN METODE LINEAR PROGRAMMING PADA PROYEK X

Verian Fernando Christanto, Iwan B. Santoso

255-266

https://doi.org/10.24912/jmts.v3i2.6979
Abstract : 318 | PDF : 1200

KAJIAN EFISIENSI PERENCANAAN PC-I GIRDER DENGAN MENGGUNAKAN SISTEM STRAND 0,5” DAN 0,6” TERHADAP KEKUATAN DAN BIAYA

Jessen Richarlim, Edison Leo

11-18

https://doi.org/10.24912/jmts.v3i1.6930
Abstract : 282 | PDF : 979

ANALISIS BIAYA PELAKSANAAN PROYEK KONSTRUKSI GEDUNG BERTINGKAT DENGAN KONSEP KONSTRUKSI HIJAU

Clara Alverina, Jane Sekarsari Tamtana

245-254

https://doi.org/10.24912/jmts.v3i2.7051
Abstract : 974 | PDF : 1906

ANALISIS KOEFISIEN PEKERJAAN PEMBESIAN PADA KONSTRUKSI GEDUNG BERTINGKAT

Eric Leonardy, Jane Sekarsari

1327-1334

https://doi.org/10.24912/jmts.v3i4.8393
Abstract : 536 | PDF : 733 Analisis Koefisien Pekerjaan Pem : 0

PENGARUH CHANGE ORDER TERHADAP BIAYA, MUTU, DAN WAKTU PADA PROYEK KONSTRUKSI GEDUNG BERTINGKAT

Hendy Eka Putra, Hendrik Sulistio

1349-1362

https://doi.org/10.24912/jmts.v3i4.8233
Abstract : 1527 | PDF : 1344

ANALISIS PENGARUH KETERLAMBATAN PROYEK TERHADAP ESTIMASI BIAYA DAN WAKTU PENYELESAIAN PROYEK X DI SAWANGAN

Antonius Erick Susanto, Henny Wiyanto
https://doi.org/10.24912/jmts.v8i1.32613
Abstract : 386 | PDF : 258

PENGARUH FAKTOR KARAKTERISTIK DEMOGRAFI TERHADAP BIAYA PROYEK INFRASTRUKTUR DESA TERTINGGAL

Pieter Geni, Basuki Anondho

215-222

https://doi.org/10.24912/jmts.v3i1.7026
Abstract : 335 | PDF : 1069

ANALISIS WAKTU DAN BIAYA PERCEPATAN PROYEK BERDASARKAN WAKTU LEMBUR

Maritza Hayfa Maulidiani Haris, Henny Wiyanto

711-722

Abstract : 243 | PDF : 135

PERINGKAT FAKTOR-FAKTOR YANG MEMPENGARUHI TERJADINYA COST OVERRUN PADA PROYEK KONSTRUKSI PADA MASA PANDEMI COVID-19

Vincent Andian, Mega Waty

671-680

https://doi.org/10.24912/jmts.v5i3.20258
Abstract : 171 | PDF : 216

PENGHEMATAN BIAYA PEMBANGUNAN GEDUNG DIPO CENTER DENGAN MUTU BETON BERBEDA

Evan Suryana Laurensius, Mega Waty
https://doi.org/10.24912/jmts.v8i1.32635
Abstract : 114 | PDF : 98

OPTIMALISASI BIAYA PEMBANGUNAN STRUKTUR DINDING PENAHAN TANAH DENGAN REVETMENT WALL SEBAGAI PERIMETER PERUMAHAN X

Hauwendy Hauwendy, Arianti Sutandi
https://doi.org/10.24912/jmts.v8i1.32630
Abstract : 122 | PDF : 108

PERENCANAAN TEBAL OVERLAY DAN ESTIMASI BIAYA PERBAIKAN JALAN DENGAN METODE BINA MARGA 2017 DAN 1987

Dwi Ayu Lestari Dwi Ayu Lestari, Akhmad Hasanuddin, Tatang Maulana Maliq

1303-1314

https://doi.org/10.24912/jmts.v7i4.29046
Abstract : 244 | PDF : 96

PENYEBAB SISA MATERIAL PADA PROYEK PEMBANGUNAN RUMAH TINGGAL X DI SERANG

Caesar Dasha Prameswara, Mega Waty

997-1004

https://doi.org/10.24912/jmts.v7i3.30776
Abstract : 126 | PDF : 136
1 - 14 of 14 items

Registrasi

Registrasi – Wagon R Indonesia

Template

Template

tools

Tools

Plagiarism Tool

 Reference Management Tool, download here

Related image

Use APA Style, download here

 

sinta

Akreditasi

DESKRIPSI GAMBAR

AuthorNotice

Author Notice

Ethical Statement

 

 Authorship Agreement

 

 Copyright Transfer

More information about the publishing system, Platform and Workflow by OJS/PKP.