PENYEBAB CHANGE ORDER PADA PROYEK KONSTRUKSI GEDUNG BERTINGKAT

Main Article Content

Adi Ananias Ardine
Hendrik Sulistio

Abstract

The number of high rise building construction projects in Jabodetabek area continues to grow. The main reason is increasing population of the region, so that development in the vertical direction becomes a solution. There are three important criteria in every construction project, namely cost, quality, and time. These criteria must be agreed upon and regulated in the form of a contract. Based on prior research, change orders cannot be avoided in every construction project. Change order can give complex impact and able to harm related parties. To minimize and anticipate the occurrence of change orders, it is necessary to know the factors that can cause changes in a contract. The factors that have been determined from the results of the literature study are compiled into a questionnaire to find out the main causes of change orders. The questionnaire was distributed to owners, contractors and consultants in high rise building projects in Jabodetabek area. PLS-SEM is used as a method for analyzing data in this study with the help of the smartPLS 3.0 program. From the results of the analysis carried out, obtained two factors that have a significant influence on the change order, namely construction factors and administrative factors.

 

 

ABSTRAK

Jumlah proyek konstruksi gedung bertingkat di wilayah Jabodetabek terus bertumbuh. Alasan utama karena kondisi wilayah yang semakin padat, sehingga pengembangan pembangunan ke arah vertikal menjadi solusi. Terdapat tiga kriteria penting yang menjadi fokus dalam setiap proyek konstruksi, yaitu biaya, mutu, dan waktu. Kriteria-kriteria tersebut harus disepakati dan diatur oleh pihak-pihak yang terlibat sesuai dengan ketentuan peraturan yang berlaku dalam bentuk kontrak. Berdasarkan penelitian terdahulu, perubahan atau change order merupakan hal yang umum dan tidak dapat dihindari dalam setiap proyek konstruksi. Change order memberikan dampak yang kompleks, sehingga sangat berpengaruh terhadap kinerja suatu proyek konstruksi dan dapat merugikan pihak-pihak yang terlibat di dalamnya. Untuk meminimalisir serta mengantisipasi terjadinya change order, maka perlu untuk mengetahui faktor-faktor yang dapat menyebabkan perubahan dalam suatu kontrak pada proyek konstruksi gedung bertingkat. Faktor-faktor yang sudah ditentukan dari hasil studi literatur disusun menjadi sebuah kuesioner untuk mengetahui penyebab utama dari change order. Penyebaran kuesioner tersebut dilakukan terhadap owner, kontraktor, dan konsultan pada proyek gedung bertingkat di wilayah Jabodetabek. PLS-SEM digunakan sebagai metode untuk menganalisis data pada penelitian ini dengan bantuan program smartPLS 3.0. Dari hasil analisis yang dilakukan, didapat dua faktor yang memiliki nilai pengaruh signifikan terhadap change order, yaitu faktor konstruksi dan faktor administrasi.

Article Details

Section
Articles

References

Alnuaimi, Ali S., et al. “Causes, Effects, Benefits, and Remedies of Change Orders on Public Construction Projects in Oman.” Journal of Construction Engineering and Management, volume 136(5) (2010): 615-622.

Barrie, Donald S. dan Boyd C. Paulson. Professional Construction Management : Including CM, Design-Construct, and General Contracting; THIRD EDITION. Singapore: McGraw-Hill, 1992.

Ghozali, Imam. Structural Equation Modeling metode alternatif dengan PARTIAL LEAST SQUARES (PLS), Edisi 4. Semarang: Universitas Diponegoro Semarang, 2014.

Hanna, Awad S., et al. “Impact of Change Order on Labor Efficiency for Mechanical Construction.” Journal of Construction Engineering and Management, 125 (1992): 176-184.

Hansen, Seng. Manajemen Kontrak Konstruksi; Cetakan Ketiga Edisi Revisi. Jakarta: PT Gramedia Pustaka Utama, 2017.

Hsieh, Ting-ya, Shih-tong Lu dan Chao-hui Wu. “Statistical Analysis of Causes for Change Orders in Metropolitan Public Works.” International Journal of Project Management, volume 22 (2004): 679-686.

Sapulette, W. “Analisa Penyebab dan Pengaruh Change Order pada Proyek Infrastruktur dan Bangunan Gedung di Ambon.” Jurnal TEKNOLOGI, Volume 6 Nomor 2 (2009): 627 – 633.

Sarwono dan Narimawati. Membuat Skripsi, Tesis dan Disertasi dengan Partial Least Square SEM (PLS–SEM). Yogyakarta: Penerbit Andi, 2015.

Sulistio, H dan Waty. “Analysis and Evaluation Change Order in Flexible Pavement (Case Study: Road Projects in East Kalimantan).” MEDIA KOMUNIKASI TEKNIK SIPIL, vol. 16, no. 1 (2008): 31-47.

Sulistio, H dan Wibowo. “Pengaruh Model Change Order pada Kehilangan Produktivitas dan Performa Proyek Konstruksi Jalan dari Perspektif System Teori.” MEDIA KOMUNIKASI TEKNIK SIPIL, vol. 17, no. 3 (2009): 285-293.