DAMPAK CHANGE ORDER PADA PROYEK PERKERASAN JALAN

Main Article Content

Alexander Junius
Mega Waty

Abstract

In a construction project, changes during the construction period are common. This change can be in the form of an increase or decrease in volume and type of work, changes in work specifications, or changes in the schedule for implementation. Changes in projects are often known as change orders. Change orders must be approved by all parties in a project namely, contractors, owners, and consultants. Change orders are caused by several factors such as changes in design, delays in procurement of goods, differences in field conditions, and others. The impact of this change order is felt by all parties involved in a project, but the change order has a different impact on each party involved. This study aims to determine the biggest impact of change orders from the contractor. In the questionnaire submitted the impact of change order is divided into several variables namely, the cost of quality, time, organization, and others. From the responses of respondents regarding the impact of change orders on road construction projects, an analysis was performed with the calculation of the Relative Importance Index (RII), and the biggest impact was obtained. Before the data is processed with RII, the validity and reliability tests are performed first. The biggest impact of change orders caused by change orders is that change orders increase the budget for contractors, change orders increase overhead costs, increase project duration, cause project costs overruns, and change orders cause a decrease in project profits.

 

Abstrak

Pada suatu proyek konstruksi, perubahan selama masa konstruksi merupakan hal yang umum terjadi. Perubahan ini bisa berupa penambahan atau pengurangan volume dan jenis pekerjaan, perubahan spesifikasi pekerjaan, maupun perubahan jadwal pelakasnaan. Perubahan dalam proyek sering dikenal change order. Change order harus disetujui oleh semua pihak yang ada dalam suatu proyek, yaitu kontraktor, pemilik, dan konsultan. Change order disebabkan oleh beberapa faktor seperti perubahan desain, keterlambatan pengadaan barang, perbedaan kondisi lapangan, dan lain-lain. Dampak dari change order ini dirasakan seluruh pihak yang terlibat dalam suatu proyek, namun change order menimbulkan dampak yang berbeda pada tiap pihak yang terlibat. Penelitian ini bertujuan untuk mengetahui dampak change order terbesar dari pihak kontraktor. Dalam kuesioner yang diajukan dampak change order dibagi menjadi beberapa variabel yaitu, biaya mutu, waktu, organisasi, dan lainnya. Dari hasil tanggapan responden mengenai dampak change order pada proyek konstruksi jalan, dilakukan analisis dengan perhitungan Relative Importance Index (RII), dan didapat dampak terbesar. Sebelum data diolah dengan RII dilakukan uji validitas dan uji reliabilitas terlebih dahulu. Dampak change order terbesar yang ditimbulkan oleh change order adalah change order menambah anggaran untuk kontraktor, change order meningkatkan biaya overhead, menambah durasi proyek, menyebabkan biaya proyek membengkak, dan change order menyebabkan penurunan keuntungan proyek.

Article Details

Section
Articles

References

Alnuaimi, Ali S., et al. “Causes, Effects, Benefits, and Remedies of Change Orders on Public Construction Projects in Oman.” Journal of Construction Engineering and Management, vol. 136, no. 5, 2010, pp. 615–22

Fisk, Edward. Construction Project Administration. 9th ed., Pearson, 2010.

Hardjomuljadi, Sarwono. Strategi Klaim Konstruksi Berdasarkan Fidic Conditions Of Contract. Pola Grade, 2006.

Hsieh, Ting-Ya., Lu, Shih-Tong., and Wu, Chao-Hui. “Statistical Analysis of Causes for Change order in Metropolitan Public Work”. International Journal of Project Management, 22.p.679-686, 2004

Peraturan Presiden Republik Indonesia Nomor 54. Jakarta: 2010

Kementrian Pekerjaan Umum. Dokumen Pelelangan Nasional Penyediaan Pekerjaan Konstruksi (Pemborongan) Untuk Kontrak Harga Satuan. Jakarta: 2010

Keane, Patrick, et al. “Variations and Change Orders on Construction Projects.” Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, vol. 2, no. 2, 2010, pp. 89–96

Martanti, Ana Yuni, and Sarwono Hardjomuljadi. “The Effect of Contract Change Order on Contractor Financing in Government Projects.” International Journal of Civil Engineering and Technology, vol. 9, no. 6, 2018, pp. 665–71.

Onkar, Jadhav. “Review Analysis on Causes and Effects of Change Orders on Construction Projects.” International Journal on Recent and Innovation Trends in Computing and Communication, vol. 3, no. 4, 2015, pp. 2230–33.

Soeharto, Iman. Manajemen Proyek (Dari Konseptual Sampai Operasional). 2nd ed., Erlangga, 1999.

Sulistio, Hendrik, and Mega Waty. “Analysis and Evaluation Change Order in Flexible Pavement (Case Study: Road Projects in East Kalimantan).” Media Komunikasi Teknik Sipil, vol. 16, no. 1, 2008, pp. 31–47, doi:10.14710/mkts.v16i1.3664.