FAKTOR-FAKTOR YANG MEMPENGARUHI PRODUKTIVITAS PEKERJA PADA PELAKSANAAN KONSTRUKSI GEDUNG BERTINGKAT

Main Article Content

Yodie Hernandi
Jane Sekarsari Tamtana

Abstract

ABSTRACT

Construction competition in Indonesia at globalization era is very tight because the presence of foreign contractors in the domestic market. Along with the development of technology in construction sector, request for a skilled, trained, and proven worker with high productivity is very needed. Various obstacles may occur in the field that will affect the quality factors, costs, and time that has been planned. The purpose of study is to determine the factors that affect worker productivity. The research method used in this study is a survey method and processed by validity, reliability and descriptive statistical methods. After analyzing the data, concluded that there are 10 factors which affect the productivity of workers in the implementation of multi-storey building construction, work drawings changes, limited work area, weather changes, lack of space to rest, material availability, working at height, construction implementation methods , damaged equipment, misunderstandings between workers, and inspection delays. However, the factor that most influences worker productivity is material availability which can make work delayed.


ABSTRAK

Persaingan kontraktor di Indonesia pada era globalisasi sangat ketat karena hadirnya kontraktor asing ke pasar konstruksi domestik. Seiring berkembangnya teknologi konstruksi pada saat ini, kebutuhan terhadap tenaga kerja yang terampil, terlatih, dan terbukti memiliki produktivitas tinggi sangat dibutuhkan. Berbagai kendala mungkin terjadi di lapangan yang akan mempengaruhi faktor mutu, biaya, dan waktu yang telah direncanakan. Sehingga, seorang manajemen proyek harus dapat menemukan faktor-faktor yang menyebabkan masalah tersebut dan memikirkan solusi untuk masalah tersebut. Tujuan dari penelitian ini adalah mengetahui faktor-faktor yang mempengaruhi produktivitas pekerja pada konstruksi gedung bertingkat. Metode penelitian yang akan digunakan dalam studi ini adalah metode survei dan diolah dengan uji validitas, uji realibilitas dan metode statistik deskriptif. Setelah dilakukan analisis data, dapat disimpulkan terdapat 10 faktor-faktor yang mempengaruhi produktivitas pekerja pada pelaksanaan konstruksi gedung bertingkat yaitu faktor perubahan gambar kerja, keterbatasan area kerja, terdapatnya perubahan cuaca, kurangnya tempat untuk beristirahat kurangnya ketersediaan material, bekerja di ketinggian, metode pelaksanaan konstruksi, peralatan yang rusak, terjadi kesalahpahaman antar pekerja, serta keterlambatan inspeksi. Namun, faktor yang paling mempengaruhi produktivitas pekerja adalah faktor kurangnya ketersediaan material yang dapat membuat pekerjaan menjadi tertunda.


Article Details

Section
Articles

References

Asiyanto. Construction Project Cost Management. Jakarta: PT.Pranya Paramita, 2003.

Ervianto, Wulfram I. Manajemen Proyek Konstruksi. Yogyakarta: Penerbit Andi, 2002.

Gaspersz V. Manajemen Produktivitas Total Strategi Peningkatan Produktivitas Bisnis Global. Jakarta: PT. Gramedia Pustaka Utama, 1998.

Harris, Soepardi, Bambang Perkasa Alam, dkk. Pengaruh Produktivitas Kerja Terhadap Keterlambatan Pelaksanaan Proyek Konstruksi Bangunan. Jakarta: Universitas Indraprasta PGRI, 2017.

Mandani, T. Analisis Produktivitas Tenaga Kerja Pada Pekerjaan Pasangan Bata. Surakarta: Universitas Sebelas Maret, 2010.

Margareth, Lely dan Manlian Ronald A. Simanjuntak. Pengaruh Produktivitas Tenaga Kerja Terhadap Kinerja Proyek Bangunan Tinggi Di DKI Jakarta. Jakarta: Universitas Pelita Harapan, 2010.

Murodif, Atfal. Pengukuran Produktivitas Dan Faktor-Faktor Yang Mempengaruhi Dalam Pembangunan Gedung Menara Sentraya Jakarta. Bogor: Institut Pertanian Bogor, 2016.

Rini, Inda Prasetya dan Andi Tenrisukki Tenriajeng. Analisis Risiko Produktivitas Tenaga Kerja Terhadap Kinerja Waktu Proyek Pada Bangunan Bertingkat. Jakarta: Universitas Gunadarma, 2014.

Soekirno, Purnomo. Pengantar Manjemen Proyek. Yogyakarta: Teknik Sipil UII, 1999.

Supradi, Hendri. Faktor-Faktor yang Mempengaruhi Produktivitas Kontraktor Bangunan Gedung. Jakarta: Universitas Tarumanagara, 2004.

Taufik, Mohammad. Pengelolaan Risiko Kualitas Pada Tahap Pelaksanaan Konstruksi Di Lingkungan PT. X. Depok: Universitas Indonesia, 2010.

Widodo, Suparno.E. Manajemen Pengembangan Sumber Daya Manusia. Yogyakarta: Pustaka Pelajar, 2015.