PERKEMBANGAN BIM DAN DAMPAKNYA PADA TRANSFORMASI SEKTOR KONSTRUKSI
Main Article Content
Abstract
Technological advancements have reshaped our work principles, deviating from established standards. In the construction industry, many individuals and companies persist in using outdated technology, overlooking current technological strides. Building Information Modeling (BIM) stands out as a contemporary solution, offering numerous benefits not only to individual stakeholders but also to all parties involved in a construction project. Despite BIM's potential advantages, numerous practitioners remain entrenched in their comfort zones, demonstrating a lack of awareness. In response to this, a collection of articles addressing various aspects of BIM, including its benefits, obstacles, challenges, and integration with technologies like Computer-Aided Design (CAD), Unmanned Aerial Vehicles (UAV), and the Internet of Things (IoT), has been assembled. By accentuating BIM's distinctive characteristics, this research seeks to enhance awareness, ultimately fostering increased adoption and development of BIM technologies. The comprehensive exploration of BIM's traits aims to bolster awareness, paving the way for widespread adoption and advancement within the construction industry.
Abstrak
Pekembangan teknologi terus mengubah prinsip-prinsip kerja yang sudah terbentuk sebelumnya. Pada industri konstruksi, sayangnya masih banyak individu dan perusahaan yang menggunakan teknologi lama dan mengabaikan kemajuan teknologi saat ini. Building Information Modeling (BIM) menjadi salah satu solusi terkini yang memberikan banyak manfaat tidak hanya untuk pihak-pihak terkait individual tetapi juga untuk semua pihak yang terlibat dalam proyek konstruksi. Meskipun demikian, banyak praktisi yang masih nyaman menggunakan teknologi lama, hal tersebut menunjukkan masih kurangnya kesadaran terhadap pentingnya BIM sebagai teknologi terkini. Sebagai respons terhadap hal tersebut, beberapa artikel terkait BIM telah dikumpulkan, membahas manfaat, hambatan, tantangan, dan integrasi dengan teknologi lain seperti Computer-Aided Design (CAD), Unmanned Aerial Vehicles (UAV), dan Internet of Things (IoT). Dengan menyoroti karakteristik unik BIM, penelitian ini bertujuan untuk meningkatkan kesadaran, sehingga memperkuat peluang adopsi dan pengembangan teknologi BIM. Eksplorasi menyeluruh terhadap sifat-sifat BIM bertujuan untuk memperkuat kesadaran (awareness), membuka jalan bagi adopsi dan kemajuan luas dalam industri konstruksi.
Article Details
This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.
This work is licensed under Jurnal Mitra Teknik Sipil (JMTS) Creative Commons Attribution-ShareAlike 4.0 International License.References
Abbas, A., Din, Z. U., & Farooqui, R. (2016). Integration of BIM in construction management education: an overview of Pakistani Engineering universities. Procedia Engineering, 145, 151-157. https://doi.org/10.1016/j.proeng.2016.04.034
Adibfar, A., Costin, A., & Issa, R. R. (2020). Design copyright in architecture, engineering, and construction industry: Review of history, pitfalls, and lessons learned. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 12(3). https://doi.org/10.1061/(ASCE)LA.1943-4170.0000421
Afzal, M., & Shafiq, M. T. (2021). Evaluating 4D-BIM and VR for effective safety communication and training: a case study of multilingual construction job-site crew. Buildings, 11(8), 319. https://doi.org/10.3390/buildings11080319
Al-Ashmori, Y. Y., Othman, I., Rahmawati, Y., Amran, Y. M., Sabah, S. A., Rafindadi, A. D. U., & Mikić, M. (2020). BIM benefits and its influence on the BIM implementation in Malaysia. Ain Shams Engineering Journal, 11(4), 1013-1019.
Aladag, H., Demirdögen, G., & Isık, Z. (2016). Building Information Modeling (BIM) use in Turkish construction industry. Procedia Engineering, 161, 174–179. https://doi.org/10.1016/j.proeng.2016.08.520
Azhar, S. (2017). Role of visualization technologies in safety planning and management at construction jobsites. Procedia Engineering, 171, 215–226. https://doi.org/10.1016/j.proeng.2017.01.329
Blanco, F. G. B., & Chen, H. (2014). The implementation of Building Information Modelling in the United Kingdom by the transport industry. Procedia - Social and Behavioral Sciences, 138, 510–520. https://doi.org/10.1016/j.sbspro.2014.07.232
BorjeGhaleh, R. M., & Sardroud, J. M. (2016). Approaching industrialization of buildings and integrated construction using Building Information Modeling. Procedia Engineering, 164, 534–541. https://doi.org/10.1016/j.proeng.2016.11.655
Boton, C., Kubicki, S., & Halin, G. (2015). The challenge of level of development in 4D/BIM simulation across AEC project lifecyle a case study. Procedia Engineering, 123, 59–67.
Bui, N., Merschbrock, C., & Munkvold, B. E. (2016). A review of Building Information Modelling for construction in developing countries. Procedia Engineering, 164, 487–494. Sciencedirect. https://doi.org/10.1016/j.proeng.2016.11.649
Carvalho, J. P., Villaschi, F. S., & Bragança, L. (2021). Assessing life cycle environmental and economic impacts of building construction solutions with BIM. Sustainability, 13(16), 8914. https://doi.org/10.3390/su13168914
Carvalho, J., Almeida, M., Bragança, L., & Mateus, R. (2021). BIM-Based energy analysis and sustainability assessment—application to Portuguese buildings. Buildings, 11(6), 246. https://doi.org/10.3390/buildings11060246
Castañeda, K., Sánchez, O., Herrera, R. F., Pellicer, E., & Porras, H. (2021). BIM-based traffic analysis and simulation at road intersection design. Automation in Construction, 131. https://doi.org/10.1016/j.autcon.2021.103911
Chandra, H. P., Nugraha, P., & Putra, E. S. (2017). Building Information Modeling in the architecture-engineering construction project in Surabaya. Procedia Engineering, 171, 348–353. https://doi.org/10.1016/j.proeng.2017.01.343
Chen, Y., Cai, X., Li, J., Zhang, W., & Liu, Z. (2022). The values and barriers of Building Information Modeling (BIM) implementation combination evaluation in smart building energy and efficiency. Energy Reports, 8, 96–111. https://doi.org/10.1016/j.egyr.2022.03.075
Cheng, B., Lu, K., Li, J., Chen, H., Luo, X., & Shafique, M. (2022). Comprehensive assessment of embodied environmental impacts of buildings using normalized environmental impact factors. Journal of Cleaner Production, 334. https://doi.org/10.1016/j.jclepro.2021.130083
Czmoch, I., & Kala, A. (2014). Traditional design versus BIM based design. Procedia Engineering, 91, 210–215. https://doi.org/10.1016/j.proeng.2014.12.048
Dorozhkina, E. (2022). Features of interaction of participants in the construction of transport infrastructure facilities at the stage of implementing BIM technologies. Transportation Research Procedia, 63, 2703–2709. https://doi.org/10.1016/j.trpro.2022.06.312
Eldeep, Ahmed. M., Farag, Moataz. A. M., & El-hafez, L. M. A. (2021). Using BIM as a lean management tool in construction processes – A case study. Ain Shams Engineering Journal, 13(2). https://doi.org/10.1016/j.asej.2021.07.009
Fernández-Mora, V., Navarro, I. J., & Yepes, V. (2022). Integration of the structural project into the BIM paradigm: A literature review. Journal of Building Engineering. https://doi.org/10.1016/j.jobe.2022.104318
Gerrish, T., Ruikar, K., Cook, M., Johnson, M., Phillip, M., & Lowry, C. (2017). BIM application to building energy performance visualisation and management: Challenges and potential. Energy and Buildings, 144, 218–228. https://doi.org/10.1016/j.enbuild.2017.03.032
Getuli, V., Ventura, S. M., Capone, P., & Ciribini, A. L. (2016). A BIM-based construction supply chain framework for monitoring progress and coordination of site activities. Procedia Engineering, 164, 542–549. https://doi.org/10.1016/j.proeng.2016.11.656
Gupta, S., & Nair, S. (2023). A review of the emerging role of UAVs in construction site safety monitoring. Materials Today: Proceedings. https://doi.org/10.1016/j.matpr.2023.03.135
Hallén, K. O., Forsman, M., & Eriksson, A. (2023). Interactions between human, technology and organization in Building Information Modelling (BIM) - A scoping review of critical factors for the individual user. International Journal of Industrial Ergonomics, 97. https://doi.org/10.1016/j.ergon.2023.103480
Hasan, A. M. M., Torky, A. A., & Rashed, Y. F. (2019). Geometrically accurate structural analysis models in BIM-centered software. Automation in Construction, 104, 299–321. https://doi.org/10.1016/j.autcon.2019.04.022
https://doi.org/10.1016/j.proeng.2015.10.058
Jankowski, B., Prokocki, J., & Krzemiński, M. (2015). Functional assessment of BIM methodology based on implementation in design and construction company. Procedia Engineering, 111, 351–355. https://doi.org/10.1016/j.proeng.2015.07.100
Jiang, F., Ma, L., Broyd, T., Chen, K., Luo, H., & Du, M. (2022). Building demolition estimation in urban road widening projects using as-is BIM models. Automation in Construction, 144. https://doi.org/10.1016/j.autcon.2022.104601
Lee, S., Tae, S., Roh, S., & Kim, T. (2015). Green template for life cycle assessment of buildings based on building information modeling: focus on embodied environmental impact. Sustainability, 7(12), 16498–16512. https://doi.org/10.3390/su71215830
Li, X. J., Lai, J., Ma, C., & Wang, C. (2021). Using BIM to research carbon footprint during the materialization phase of prefabricated concrete buildings: A China study. Journal of Cleaner Production, 279. https://doi.org/10.1016/j.jclepro.2020.123454
Lidelöw, S., Engström, S., & Samuelson, O. (2023). The promise of BIM? Searching for realized benefits in the Nordic architecture, engineering, construction, and operation industries. Journal of Building Engineering, 76. https://doi.org/10.1016/j.jobe.2023.107067
Lin, Y. C., Chen, Y. P., Yien, H. W., Huang, C. Y., & Su, Y. C. (2018). Integrated BIM, game engine and VR technologies for healthcare design: A case study in cancer hospital. Advanced Engineering Informatics, 36, 130–145. https://doi.org/10.1016/j.aei.2018.03.005
Lindblad, H., & Vass, S. (2015). BIM implementation and organisational change: A case study of a large Swedish public client. Procedia Economics and Finance, 21, 178–184. https://doi.org/10.1016/s2212-5671(15)00165-3
Liu, Q., & Wang, Z. (2022). Green BIM-based study on the green performance of university buildings in northern China. Energy, Sustainability and Society, 12(1). https://doi.org/10.1186/s13705-022-00341-9
Maskil-Leitan, R., Gurevich, U., & Reychav, I. (2020). BIM Management Measure for an Effective Green Building Project. Buildings, 10(9), 147. https://doi.org/10.3390/buildings10090147
Matějka, P., & Tomek, A. (2017). Ontology of BIM in a construction project life cycle. Procedia Engineering, 196, 1080–1087. https://doi.org/10.1016/j.proeng.2017.08.065
Mehran, D. (2016). exploring the adoption of BIM in the UAE construction industry for AEC firms. Procedia Engineering, 145, 1110–1118. https://doi.org/10.1016/j.proeng.2016.04.144
Meng, H., Yang, X., Gao, L., & Wang, C. (2023). Research on railway BIM platform framework based on homemade graphics engine. High-Speed Railway, 1(3), 204–210. https://doi.org/10.1016/j.hspr.2023.08.001
Mésároš, P., Spišáková, M., Mandičák, T., Čabala, J., & Oravec, M. M. (2021). Adaptive design of formworks for building renovation considering the sustainability of construction in BIM environment—case study. Sustainability, 13(2), 799. https://doi.org/10.3390/su13020799
Migilinskas, D., Popov, V., Juocevicius, V., & Ustinovichius, L. (2013). The Benefits, obstacles and problems of practical BIM implementation. Procedia Engineering, 57, 767–774. https://doi.org/10.1016/j.proeng.2013.04.097
Morczinek, D., Hemann, G., & Kersnowski, A. (2020). Artificial Intelligence combined with UAVs is set to increase drafting efficiency in engineering and surveying. International Conference on Transportation and Development 2020. https://doi.org/10.1061/9780784483138.006
Morlhon, R., Pellerin, R., & Bourgault, M. (2014). Building Information Modeling implementation through maturity evaluation and critical success factors management. Procedia Technology, 16, 1126–1134. https://doi.org/10.1016/j.protcy.2014.10.127
National BIM Standard-United States® V3 | National BIM Standard - United States. (n.d.). Www.nationalbimstandard.org. https://www.nationalbimstandard.org/nbims-us-v3
Ngowtanasawan, G. (2017). A causal model of BIM adoption in the Thai architectural and engineering design industry. Procedia Engineering, 180, 793–803. https://doi.org/10.1016/j.proeng.2017.04.240
Othman, I., Al-Ashmori, Y. Y., Rahmawati, Y., Amran, Y. H. M., & Al-Bared, M. A. M. (2020). The level of Building Information Modelling (BIM) implementation in Malaysia. Ain Shams Engineering Journal, 12(1). https://doi.org/10.1016/j.asej.2020.04.007
Pavlovskis, M., Migilinskas, D., Antuchevičienė, J., Urba, I., & Zigmund, V. (2017). Problems in reconstruction projects, BIM uses and decision-making: Lithuanian case studies. Procedia Engineering, 208, 125–128. https://doi.org/10.1016/j.proeng.2017.11.029
Quinn, C., Shabestari, A. Z., Misic, T., Gilani, S., Litoiu, M., & McArthur, J. J. (2020). Building automation system - BIM integration using a linked data structure. Automation in Construction, 118. https://doi.org/10.1016/j.autcon.2020.103257
Rahimian, F. P., Seyedzadeh, S., Oliver, S., Rodriguez, S., & Dawood, N. (2020). On-demand monitoring of construction projects through a game-like hybrid application of BIM and machine learning. Automation in Construction, 110. https://doi.org/10.1016/j.autcon.2019.103012
Ratajczak, J., Riedl, M., & Matt, D. T. (2019). BIM-based and AR application combined with location-based management system for the improvement of the construction performance. Buildings, 9(5), 118. https://doi.org/10.3390/buildings9050118
Sacks, R., Girolami, M., & Brilakis, I. (2020). Building information modelling, artificial intelligence and construction tech. Developments in the Built Environment, 4. https://doi.org/10.1016/j.dibe.2020.100011
Sampaio, A. Z. (2022). Project management in office: BIM implementation. Procedia Computer Science, 196, 840–847. https://doi.org/10.1016/j.procs.2021.12.083
Sampaio, A. Z. (2023). BIM training course improving skills of construction industry professionals. Procedia Computer Science, 219, 2035–2042. https://doi.org/10.1016/j.procs.2023.01.505
Sattineni, A., & Schmidt, T. (2015). Implementation of mobile devices on jobsites in the construction industry. Procedia Engineering, 123, 488–495. https://doi.org/10.1016/j.proeng.2015.10.100
Schimanski, C. P., Pradhan, N. L., Chaltsev, D., Monizza, G. P., & Matt, D. T. (2021). Integrating BIM with lean construction approach: functional requirements and production management software. Automation in Construction, 132. https://doi.org/10.1016/j.autcon.2021.103969
Sestras, P., Roșca, S., Bilașco, Ș., Naș, S., Buru, S. M., Kovacs, L., Spalević, V., & Sestras, A. F. (2020). Feasibility assessments using unmanned aerial vehicle technology in heritage buildings: Rehabilitation-restoration, Spatial Analysis and Tourism Potential Analysis. Sensors, 20(7). https://doi.org/10.3390/s20072054
Shaqour, E. N. (2021). The role of implementing BIM applications in enhancing project management knowledge areas in Egypt. Ain Shams Engineering Journal, 13(1). https://doi.org/10.1016/j.asej.2021.05.023
Smith, P. (2014). BIM implementation – global strategies. Procedia Engineering, 85, 482–492. https://doi.org/10.1016/j.proeng.2014.10.575
Song, C., Wang, K., & Chin, J. (2020). BIM-Aided Scanning Path Planning for Autonomous Surveillance UAVs with LiDAR. Proceedings of the ISARC. https://doi.org/10.22260/isarc2020/0164
Soust-Verdaguer, B., Llatas, C., & Moya, L. (2020). Comparative BIM-based life cycle assessment of Uruguayan timber and concrete-masonry single-family houses in design stage. Journal of Cleaner Production, 277. https://doi.org/10.1016/j.jclepro.2020.121958
Steadman, P., Evans, S., Liddiard, R., Godoy-Shimizu, D., Ruyssevelt, P., & Humphrey, D. (2020). Building stock energy modelling in the UK: the 3DStock method and the London Building Stock Model. Buildings and Cities, 1(1), 100–119. https://doi.org/10.5334/bc.52
Syamimi, A., Gong, Y., & Liew, R. (2020). VR industrial applications―A Singapore perspective. Virtual Reality & Intelligent Hardware, 2(5), 409–420. https://doi.org/10.1016/j.vrih.2020.06.001
Tak, A. N., Taghaddos, H., Mousaei, A., Bolourani, A., & Hermann, U. (2021). BIM-based 4D mobile crane simulation and onsite operation management. Automation in Construction, 128. https://doi.org/10.1016/j.autcon.2021.103766
Takim, R., Harris, M., & Nawawi, A. H. (2013). Building Information Modeling (BIM): A new paradigm for quality of life within architectural, engineering and construction (AEC) industry. Procedia - Social and Behavioral Sciences, 101, 23–32. https://doi.org/10.1016/j.sbspro.2013.07.175
Takyi-Annan, G. E., & Hong, Z. (2023). A bibliometric analysis of building information modelling implementation barriers in the developing world using an interpretive structural modelling approach. Heliyon, 9(8). https://doi.org/10.1016/j.heliyon.2023.e18601
Tan, Y., Li, G., Cai, R., Ma, J., & Wang, M. (2022). Mapping and modelling defect data from UAV captured images to BIM for building external wall inspection. Automation in Construction, 139, 104284.
Tan, Y., Li, S., Liu, H., Chen, P., & Zhou, Z. (2021). Automatic inspection data collection of building surface based on BIM and UAV. Automation in Construction, 131, 103881.
Tawelian, L. R., & Mickovski, S. B. (2016). The implementation of geotechnical data into the BIM process. Procedia Engineering, 143, 734-741.
Tomek, R., & Kalinichuk, S. (2015). Agile PM and BIM: A hybrid scheduling approach for a technological construction project. Procedia Engineering, 123, 557–564. https://doi.org/10.1016/j.proeng.2015.10.108
Tulenheimo, R. (2015). Challenges of implementing new technologies in the world of BIM – case study from construction engineering industry in Finland. Procedia Economics and Finance, 21, 469–477. https://doi.org/10.1016/s2212-5671(15)00201-4
Ugliotti, F. M., Osello, A., Rizzo, C., & Muratore, L. (2019). BIM-based structural survey design. Procedia Structural Integrity, 18, 809–815. https://doi.org/10.1016/j.prostr.2019.08.230
Volkov, A., Chelyshkov, P., & Lysenko, D. (2016). Information management in the application of BIM in construction. Stages of Construction. Procedia Engineering, 153, 833–837. https://doi.org/10.1016/j.proeng.2016.08.251
Wang, T., Ali, A. S., & Au-Yong, C. P. (2022). Exploring a body of knowledge for promoting the building information model for facility management. Ain Shams Engineering Journal, 13(4). https://doi.org/10.1016/j.asej.2022.101717
Wang, Y. G., He, X. J., He, J., & Fan, C. (2022). Virtual trial assembly of steel structure based on BIM platform. Automation in Construction, 141. https://doi.org/10.1016/j.autcon.2022.104395
Yan, F., Hu, Y., Jia, J., Ai, Z., Tang, K., Shi, Z., & Liu, X. (2020). Interactive WebVR visualization for online fire evacuation training. Multimedia Tools and Applications, 79(41-42), 31541–31565. https://doi.org/10.1007/s11042-020-08863-0
Yang, X., Hu, M., Wu, J., & Zhao, B. (2018). Building-information-modeling enabled life cycle assessment, a case study on carbon footprint accounting for a residential building in China. Journal of Cleaner Production, 183, 729–743. https://doi.org/10.1016/j.jclepro.2018.02.070
Zaia, Y. Y., Adam, S. M., & Abdulrahman, F. H. (2022). Investigating BIM level in Iraqi construction industry. Ain Shams Engineering Journal, 14(3). https://doi.org/10.1016/j.asej.2022.101881
Zhang, C., & Huang, H. (2019, June). As-built bim updating based on image processing and artificial intelligence. In ASCE International Conference on Computing in Civil Engineering 2019 (pp. 9-16). Reston, VA: American Society of Civil Engineers.
Zhang, C., Nizam, R. S., & Tian, L. (2018). BIM-based investigation of total energy consumption in delivering building products. Advanced Engineering Informatics, 38, 370-380.
Zhang, C., Wang, F., Zou, Y., Dimyadi, J., Guo, B. H., & Hou, L. (2023). Automated UAV image-to-BIM registration for building façade inspection using improved generalised Hough transform. Automation in Construction, 153, 104957.
Zhao, L., Zhang, W., & Wang, W. (2022). BIM-based multi-objective optimization of low-carbon and energy-saving buildings. Sustainability, 14(20), 13064.