ANALISIS PRODUKTIVITAS TENAGA KERJA PADA PENGERJAAN KOLOM DI PROYEK DNL
Main Article Content
Abstract
Productivity is key to a company's competitiveness, influencing project success and costs. This research analyzes labor productivity in column work on the DNL project by comparing it with SNI standards and the PUPR Ministerial Regulation. The method used in this research is Worksampling on the DNL project. The research results show a large difference between field and reference productivity. Reinforcement work has a productivity difference of 0.46 times from SNI and 1.28 times from PermenPUPR. This is due to the use of more efficient tools and implementation methods in the field. Increased productivity also occurs in formwork and casting work through the use of appropriate technology and tools. These comparisons provide important insights for project planners and future workforce performance assessments.
Abstrak
Produktivitas merupakan kunci daya saing perusahaan, mempengaruhi keberhasilan proyek dan biaya. Penelitian ini menganalisis produktivitas tenaga kerja pada pengerjaan kolom di proyek DNL dengan membandingkannya dengan standar SNI dan PermenPUPR. Metode yang digunakan dalam penelitian ini adalah Worksampling pada proyek DNL. Hasil penelitian menunjukkan perbedaan besar antara produktivitas lapangan dan acuan. Pekerjaan pembesian memiliki perbedaan produktivitas sebesar 0,46 kali dari SNI dan 1,28 kali dari PermenPUPR. Hal ini disebabkan oleh penggunaan alat bantu dan metode pelaksanaan yang lebih efisien di lapangan. Peningkatan produktivitas juga terjadi pada pekerjaan bekisting dan pengecoran melalui penggunaan teknologi dan alat bantu yang sesuai. Perbandingan ini memberikan wawasan penting bagi perencana proyek dan penilaian kinerja tenaga kerja di masa mendatang.
Article Details
This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.
This work is licensed under Jurnal Mitra Teknik Sipil (JMTS) Creative Commons Attribution-ShareAlike 4.0 International License.References
Alaghbari, W., Al-Sakkaf, A. A., & Sultan, B. (2019). Factors affecting construction labour productivity in Yemen. International Journal of Construction Management, 19(1), 79-91.
Basari, K., Pradipta, R. Y., Hatmoko, J. U. D., & Hidayat, A. (2014). Analisa koefisien produktivitas tenaga kerja pada pekerjaan pembesian. Jurnal Karya Teknik Sipil, 3(4), 830-839.
Daryanto, 2011. Media Pembelajaran. Bandung: PT. Sarana Tutorial Nurani Sejahtera.
Fikri, H. (2023). Analisis produktivitas tenaga kerja pada pekerjaan struktur atas (studi kasus: proyek pembangunan hotel tentrem alam sutera) (Skripsi, Politeknik Negeri Jakarta).
Handoko, T. H. (2016). Manajemen personalia dan sumberdaya manusia. Bpfe.
Hariandja, M. T. E. (2002). Manajemen sumber daya manusia. Grasindo.
Karima, B. R., Khamim, M., & Setiono, J. (2020). Analisa produktivitas tenaga kerja berdasarkan Permen PUPR dan perhitungan lapangan pekerjaan beton bertulang Proyek Apartemen Bess Mansion. Jurnal Online Skripsi Manajemen Rekayasa Konstruksi (JOS-MRK), 1(2), 19-25.
Kartika, N., Robial, S. M., & Pratama, A. (2021). Analisis produktivitas tenaga kerja pada pekerjaan kolom di proyek pembangunan gedung Pemda Kabupaten Sukabumi. Jurnal Momen Teknik Sipil, 3(2), 103-112.
Lumombang, R. C., Mara, J., & Kusuma, A. (2023). Produktivitas Tenaga kerja pada pekerjaan kolom (studi kasus: proyek pembangunan gedung education center Fakultas Ilmu Sosial Dan Ilmu Politik Tahap I Universitas Hasanuddin). Paulus Civil Engineering Journal, 5(2), 256-263.
Maharani, N. (2019). Tingkat dan faktor yang mempengaruhi produktivitas tenaga kerja pada pekerjaan struktur (rate and influence factor of labour productivity in structural work) Studi Kasus: Proyek pembangunan gedung kost dua lantai di Sapen, Gondokusuman, Demangan No. 639 (Tugas Akhir, Universitas Islam Indonesia).
Natalia, M., Adibroto, F., & Lubis, R. (2020). Perbandingan produktivitas tenaga kerja dengan metode time study terhadap AHSP SNI 2016. Siklus: Jurnal Teknik Sipil, 6(2), 155-166.
Norjana, N., & Zulfiati, R. (2020). Analisa produktivitas tenaga kerja terhadap pekerjaan kolom dan balok beton bertulang. Jurnal Talenta Sipil, 3(2), 82-86.
Rizky, A. Z. P. (2019). Analisis produktivitas tenaga kerja di lapangan pada pekerjaan kolom (Analysis Of Labor Productivity In Field On Column Work) (Skripsi, Universitas Islam Indonesia).
Rogers, M., & Rogers, M. (1998). The definition and measurement of productivity (pp. 1-27). Melbourne, Australia: Melbourne Institute of Applied Economic and Social Research.
Santi, T., & Mara, J. (2023). Analisis produktivitas tenaga kerja Proyek Gedung Apartemen Bandaraya. Paulus Civil Engineering Journal, 5(2), 284-293.
Schreyer, P., & Pilat, D. (2001). Measuring productivity. OECD Economic studies, 33(2), 127-170.
Sinungan, M. (2003). Manajemen sumber daya manusia. Jakarta: Bumi Aksara.
Walangitan, R. (2012). Produktivitas tenaga kerja dengan menggunakan metode work sampling pada pekerjaan kolom dan balok Mega Trade Center Manado. TEKNO, 10(57).