ANALISIS WAKTU DAN BIAYA PERCEPATAN PROYEK BERDASARKAN WAKTU LEMBUR

Main Article Content

Maritza Hayfa Maulidiani Haris
Henny Wiyanto

Abstract

Construction projects in the execution process sometimes do not always go according to plan which can cause delays. Project schedule delays can result to the failure of a project. To overcome delays, project crashing can be carried out. Project crashing is not only seen from the time side, but also from the cost side. Costs incurred may increase due to schedule crashing. This study uses the project crashing method with 3 alternatives, which are, adding overtime by 1 hour, 2 hours, and overtime by 3 hours, as well as comparing the percentage increase in cost and decrease in duration for the three alternatives. The results showed that alternative 1 had a cost increase of 10,94% and a duration decrease of 1,23%, alternative 2 had a cost increase of 25,53% and a duration decrease of 4,76%, and alternative 3 had a cost increase of 32,82% and a duration decrease of 10,11%.


 


Abstrak


Proyek konstruksi pada proses pelaksanaannya terkadang tidak selalu sesuai perencanaannya sehingga dapat terjadi adanya keterlambatan. Keterlambatan jadwal proyek dapat menyebabkan kegagalan suatu proyek sehingga untuk mengatasi keterlambatan dapat dilakukan percepatan proyek. Percepatan proyek tidak hanya melihat dari sisi waktu, tetapi juga dari sisi biaya. Biaya yang dikeluarkan dapat meningkat akibat percepatan jadwal. Penelitian ini menggunakan metode project crashing dengan 3 alternatif yaitu, penambahan waktu lembur dengan 1 jam, penambahan waktu lembur dengan 2 jam, dan terakhir penambahan waktu lembur dengan 3 jam dan membandingkan persentase peningkatan biaya dan penurunan durasi untuk ketiga alternatif. Hasil penelitian menunjukkan bahwa alternatif 1 mempunyai peningkatan biaya sebesar 10,94% dan penurunan durasi sebesar 1,23%, alternatif 2 mempunyai peningkatan biaya sebesar 25,53% dan penurunan durasi sebesar 4,76%, serta alternatif 3 mempunyai peningkatan biaya sebesar 32,82% dan penurunan durasi sebesar 10,11%.

Article Details

Section
Articles

References

Arvianto, R., Handayani, F. S., & Setiono. (2017). Optimasi Biaya dan Waktu dengan Metode Time Cost Trade Off (TCTO) (Studi Kasus Proyek Bangunan Rawat Inap Kelas III dan Parkir RSUD Dr. Moewardi Surakarta). Matriks Teknik Sipil.

Fardila, D., & Adwayah, N. R. (2021). Optimasi Biaya dan Waktu Proyek Konstruksi dengan Lembur dan Penambahan Tenaga Kerja. Inersia: Jurnal Teknik Sipil dan Arsitektur, 17(1), 35-46. https://doi.org/10.21831/inersia.v17i1.39499

Larson, E. W., & Gray, C. F. (2018). Project Management The Managerial Process (7th ed.). New York: McGraw-Hill.

Lock, D. (2003). Project Management (8th ed.). Burlington: Gower.

Priyo, M., & Paridi, M. R. (2018). Studi Optimasi Waktu dan Biaya dengan Metode Time Cost Trade Off pada Proyek Konstruksi Pembangunan Gedung Olah Raga (GOR). Semesta Teknika, 21(1), 72-84. https://doi.org/10.18196/st.211213

Priyo, M., & Sudiro, S. (2017). Studi Optimasi Waktu dan Biaya dengan Metode Time Cost Trade Off pada Proyek Proyek Konstruksi: Studi Kasus Proyek Jalan Bugel-Galur-Poncosari Cs. Tahap I, Provinsi D.I.Yogyakarta. Semesta Teknika, 20(2), 172-186.

Project Management Institution. (2017). Project Management Body of Knowledge (6th ed.). Newtown Square, Pennsylvania: Project Management Institution,Inc.

Reynaldi, C., & Sutandi, A. (2022). Analisis Percepatan Proyek Menggunakan Metode Time Cost Trade Off- Studi Kasus Apartemen Collins Boulevard. JMTS: Jurnal Mitra Teknik Sipil, 5(2), 497-506. https://doi.org/10.24912/jmts.v5i2.16450

Soeharto, I. (1997). Manajemen Proyek dari Konseptual Sampai Operasional. Yogyakarta: Erlangga.

Soeharto, I. (1999). Manajemen Proyek (2nd ed.). Jakarta: Erlangga.

Widiasanti, I., & Lenggogeni. (2013). Manajemen Konstruksi. Bandung: PT Remaja Rosdakarya.