STUDI IDENTIFIKASI RISIKO PADA PROYEK INFRASTRUKTUR DI INDONESIA

Main Article Content

Wilwin Wilwin
Arianti Sutandi

Abstract

Infrastructure projects such as buildings and transportation infrastructure have many risks and uncertainties in the implementation process. To minimize this risk, it is necessary to apply risk management in project implementation. In this study, a literature study was conducted to analyze the risk identification methods and potential risks involved in Indonesia's infrastructure projects. An analysis was conducted by comparing the risk identification method and the risk potential in the infrastructure project risk journal collected using the basic mathematic method. Based on research, the most widely discussed identification method is the questionnaire. Furthermore, a risk comparison was carried out in the 2 most discussed categories. The checklist method was carried out so that the material and equipment, and humans were obtained as the most discussed category. The results showed that in building projects, the most discussed risk was the increase in material prices (71%) in the material and equipment category and labor accidents (86%) in the human category. Meanwhile, in transportation infrastructure projects, the most discussed risks were unavailability or shortage of material (67%) in the material and equipment category and the low quality of labor (83%) in the human category.

 

ABSTRAK

Proyek infrastruktur seperti bangunan gedung dan prasarana transportasi memiliki banyak risiko dan ketidakpastian dalam proses pelaksanaannya. Untuk meminimalkan risiko tersebut perlu diterapkannya manajemen risiko didalam pelaksanaan proyeknya. Dalam penelitian ini dilakukan studi literatur untuk menganalisa metode identifikasi risiko dan potensi risiko yang terdapat pada proyek infrastruktur di Indonesia. Dilakukan analisa dengan melakukan perbandingan metode identifikasi risiko dan potensi risiko pada jurnal risiko proyek infrastruktur yang telah dikumpulkan menggunakan metode matematis sederhana. Berdasarkan penelitian, metode identifikasi yang paling banyak dibahas adalah kuisioner. Selanjutnya dilakukan perbandingan risiko pada 2 kategori yang paling banyak dibahas, penentuan kategori ini dilakukan dengan metode checklist sehingga didapatkan kategori material dan peralatan, dan manusia sebagai kategori yang paling banyak dibahas. Hasil penelitian menunjukkan bahwa pada proyek bangunan gedung, risiko yang paling banyak dibahas adalah kenaikan harga material (71%) pada kategori material dan peralatan dan kecelakaan tenaga kerja (86%) pada kategori manusia. Sedangkan pada proyek prasarana transportasi, risiko yang paling banyak dibahas adalah tidak tersedianya atau kekurangan material (67%) pada kategori material dan peralatan dan rendahnya kualitas tenaga kerja (83%) pada kategori manusia.

Article Details

Section
Articles

References

Al-Bahar, J.F. and K.C. Crandall. "Systematic Risk Management Approach for Construction Projects." Journal of Construction Engineering and Management (1990).

Darmawi, Herman. Manajemen Risiko. Jakarta: Bumi Aksara, 2008.

Duffield, C & Trigunarsyah, B. Project Management Conception to Completion. Australia: Engineering Education Australia , 1999.

Fahmi Wati Iribaram, Miftahul Huda. "Analisa Resiko Biaya Dan Waktu Konstruksi Pada Proyek Pembangunan Apartemen Biz Square Rungkut Surabaya." Jurnal Rekayasa dan Manajemen Konstruksi (2018): 141-154.

Fisk, E.R. Construction Project Administration Fifth Edition. New Jersey: Prentice Hall, 1997.

Hanafi, M. Manajemen Risiko. Yogyakarta: Yogyakarta: Unit Penerbit Dan Percetakan Sekolah Tinggi Manajemen YKPN, 2006.

Iwan M. Ramdan, Hanna Novita Handoko. "Kecelakaan Kerja Pada Pekerja Konstruksi Informal Di Keluarahan "X" Kota Samarinda." JURNAL MKMI (2016): 12.

Kangari, R. "Risk Management Perceptions and Trends of U.S. Construction." Journal of Construction Engineering and Management (1995).

Kerzner, Harold. "Project Manajement, a System Approach to Planning, Scheduling and Controlling." 1995.

Loosemore, et al. "Risk Management in Projects." (2006).

Mustami, Adinda Ade. Harga bahan bangunan naik 0,28% setiap bulan. Oktober 2017. <https://nasional.kontan.co.id/news/harga-bahan-bangunan-naik-028-setiap-bulan>.

Nasir B. Siraj and Aminah Robinson Fayek. "Risk Identification and Common Risks in Construction: Literature Review and Content Analysis." 2019.

Novita Sari, Endang Mulyani, Safarudin M.Nuh. "Manajemen Risiko Keselamatan Dan Kesehatan Kerja Pada Pekerjaan Konstruksi." 2013.

PMBOK. A GUIDE TO THE PROJECT MANAGEMENT BODY OF KNOWLEDGE. Pennsylvania: Project Management Institute, Inc., 2008.

Prasetyo, Indra Pandu. Analisis Keterlambatan Dan Kualitas Hasil Pekerjaan Pada Proyek Konstruksi. Depok: Universitas Indonesia, 2012.

Shen, George Wu and Catherine S. K. Ng. "Risk Assessment for Construction Joint Ventura in China." Journal of Construction Engineering and Management-ASCE (2001).

Siahaan, Fanny. "Tinjauan Tentang Pekerjaan Arsitektur Dalam Proyek Konstruksi Dengan Pendekatan Pada Bangunan Gedung Bertingkat." SCALE (2015).

Soeharto, I. Manajemen Proyek (Dari Konseptual Sampai Operasional). Jakarta: Erlangga, 1999.

—. Manajemen Proyek dari konseptual sampai operasional. Jakarta: Erlangga, 1995.

Soemarno, M.S. Risiko Penggunaan Lahan dan Analisisnya Laboratorium PPJP Jurusan Tanah. Malang: FPUB, 2007.