In the development of the industrial revolution 4.0, in carrying out production at small, medium, and large levels, there has been a fairly large and significant increase. Factors that influence the goal of successful production are not only about investment, capital, suppliers, machines, skills, and distributors but also one that must be observed is the layout planning and placement of factory facilities. PT. Eworx Indonesia is a company engaged in the processing industry, especially manufacturing in the metal processing sector. PT. Eworx Indonesia intends to relocate the production floor in order to increase production productivity. In this study, the proposed layout design on the new production floor was carried out using the SLP, Blocplan, and FLAP methods. The design is done by collecting direct observation data and interviews with the operator on duty. It was found that the initial layout had problems with operator movement that was not optimal and the placement of several machines and facilities that did not pay attention to material flow resulting in a slowdown in production time. Therefore, in order to get the best layout, a comparison is made on the results of the three alternative layouts with the smallest displacement distance comparison so that the production process will run more optimally. The best proposed layout is the systematic layout planning (SLP) method with the smallest material displacement distance of 147.4 meters and material handling costs Rp. 223,958 per day. Flexsim simulations show this layout can increase production output by 15%-34%.

Article Details

Section
Articles

References

J.C. Birchfield, Design and Layout of Foodservice Facilities, Canada: John Wiley & Sons Inc, 2008.

F.E. Meyers, Plant Layout and Material Handling, New Jersey: Prentice International, 1993.

M.E. Mundel, and D.L. Danner, Motion & Time Study: Improving Productivity, Seventh Edition, USA: Prentice-Hall Publishing Company, 1994.

S. Wignjoesoebroto, Tata Letak Pabrik dan Pemindahan Bahan, Surabaya: Guna Widya, 2009.

B. Bagaskara, L. Gozali, and L. Widodo, ”Redesigning Layout Planning of Raw Material Area and Production Area Using Systematic Layout Planning (SLP) Methods (Case Study of CV Oto Boga Jaya),” IOP Conference Series: Material Science and Engineering, vol. 852, 2020.

J.M. Apple, Tata Letak Pabrik dan Pemindahan Bahan, Bandung: Institut Teknologi Bandung, 1990.

C.S. Tak, and L. Yadav, “Improvement in Layout Design using SLP of a Small Size Manufacturing Unit: A Case Study,” IOSR Journal of Engineering (IOSRJEN), vol. 2, no. 10, pp. 1-7, 2012.

D. Ramadhan, L. Widodo, L. Gozali, I.W. Sukania, F.J. Daywin, and C.O. Doaly, “Redesigning The Facility Layout With Systematic Layout Planning Method and Lean Manufacturing Approach On The Production Floor At PT. Baruna Trayindo Jaya,” Proceedings of The 11th Annual International Conference on Industrial Engineering and Operations Management, 2021.

H.I.F. Sahriyanto, I.A. Hanun, W.A. Jauhari, C.N. Rosyidi, M.R.W. Wicaksono, P.S.K. Hanifah, P.W. Laksono, and R.W. Damayanti, “Perbaikan Tata Letak Fasilitas Produksi Pabrik Garmen CV XYZ dengan Metode Blocplan,” Seminar dan Konferensi Nasional IDEC, 2022.

A.K. Tjusila, L. Gozali, and C.O. Doaly, “Factory Re-Layout with SLP, CRAFT, CORELAP, Promodel, and FlexSim for Optimization of Material Flow Movement,” Proceedings of the Second Asia Pacific International Conference on Industrial Engineering and Operations Management, 2021.

H.G. Bowden, Simulation Using Promodel Second Edition, New York: McGraw-Hill, 2004.

I. Pratiwi, E. Muslimah, and A.W. Aqil, “Perancangan Tata Letak Fasilitas di Industri Tahu Menggunakan Blocplan,” Jurnal Ilmiah Teknik Industri, vol 11, no. 2, pp. 102-112, 2012.

F.D. Hanggara, “Facility Layout Planning In Small Industry Big Boy Bakery To Increase Efficiency,” Journal of Industrial Engineering Management (JIEM), vol. 5, no. 2, pp. 72-81, 2020.

L. Gozali, L. Widodo, S.R. Nasution, and N. Lim, “Planning the New Factory Layout of PT Hartekprima Listrindo using Systematic Layout Planning (SLP) Method,” IOP Conference Series: Materials Science and Engineering, 2020.

I.W. Sukania, S. Ariyanti, and Nathaniel, “Usulan Perbaikan Tata Letak Pabrik dan Material Handling pada PT. XYZ,” Jurnal Ilmiah Teknik Industri, vol. 4, no. 3, pp. 141-148, 2016.