Abstract

This project analyses problems that occur in coating project management in oil and chemical companies. This research
investigatesseveral issuesthat cause the coating to not last long,high-budget project management costs, and job and safety
environment analysis. This study presentscoating work process recommendations on how the coating project management
should be measuredand assessed for creating a better coating. The successful completion of the inner tank cleaning and
pipe coating project demonstrated the service company's expertise for oil and chemical companies in surface preparation
and protective coatings in challenging environments. This case study underscores the importance of rigorous planning,
regulatory compliance, and commitment to safetyand environmental responsibilities in the field of inner tank cleaning
and pipe coating work.

Article Details

Section
Articles

References

[1] Gozali, A. K. T. L. Implementation of Project Management to Develop theAHA. 002 Project with PERTMethod, Gantt Chart and QM for Windows V5 Software at PT. Matahari Megah.

[2] Pinto, J.K. and Slevin, D.P. (1988) Critical Success Factors in Effective Project Implementation. In: Cleland, D.I. and King, W.R., Eds., Project Management Handbook, 2nd Edition, Van NostrandReinhold, New York, 902-909.

[3] Kerzner, H. (2017). Project Management Metrics, KPIs, and Dashboards: A Guide to Measuring andMonitoring Project Performance. Hoboken, NJ: John Wiley & Sons.

[4] Freeman, R.E. dan J. McVea. (2001). A Stakeholder Approach to Strategic Management.

[5] Project Management Institute (2017). A Guide to the Project Management Body of Knowledge.(PMBOK® Guide) – Sixth Edition

[6] Reza Javaherdashti. (2008). Tank Cleaning Guide.

[7] Raymond F. Wegman, James P. Kelsey. (2012). Surface Preparation Techniques for Adhesive Bonding.

[8] Harold Kerzner. (2022). Project Management: A Systems Approach to Planning, Scheduling, andControlling.

[9] Marshall E. Parker, Edward G. Peattie. (1988). Pipeline Corrosion and Cathodic Protection: A PracticalManual for Corrosion Engineers, technicians, and field personnel, 3rd Edition.

[10] Gozali, L., Lieanda, K., Jap, L., & Daywin, F. J. (2019, April). Analysis of Mak Diesel Engine Servicesat Merawang Power Plant Using FMEA Method. In IOP Conference Series: Materials Science and Engineering (Vol. 508, No. 1, p. 012083). IOP Publishing

[11] Gozali, L., Daywin, F. Y., & Doaly, C. O. (2020). Root Cause Analysis and Overall Equipment Effectiveness of Press Machine in Line H and Hirac At Pt. Xyz. Jurnal Muara Sains, Teknologi, Kedokteran dan Ilmu Kesehatan, 4(2), 285-294.

[12] Fernando, B., Yakup, A. F. W., Gozali, L., & Ali, A. Safety Risk Management Analysis At PT. XYZUsing The HIRADC And FMEAApproach.

[13] Laurensia, J., & Gozali, L. FMEA Method for Identifying the Risk of Failure The Boss Rotor 05K inMachining Production Process.