Factors Of Affecting The Occurrence Of Cost Overruns In Construction Projects During COVID-19 Pandemic

Main Article Content

Vincent Andian
Mega Waty

Abstract

Construction project is a design and specification process that involves coordinating all project resources such as labor, equipment, materials, fund, and technology, to complete the project on time, according to budget and standards. But since 2020 due to the COVID-19 pandemic, many construction projects have experienced Cost Overruns, especially in the jabodetabek area. Cost Overrun is very influential on the success of a construction. Therefore, research is needed on ranking factors that influence the occurrence of Cost overruns on a construction project during the COVID-19 pandemic. In this study, data will be collected through literature studies, then surveyed using questionnaires a Likert scale, a scale of 1-5 then given to each construction service provider to measure the level of influence of factors and by Relative Importance Index (RII) method will find the ranking of factors that influence the occurrence of cost overruns. Of the 20 factors obtained after the validity and reliability test, 13 factors were obtained. Using the RII method sought rankings from the 13th of such factors. The result obtained is the lack of preparation for unexpected costs has the highest influence of 0.811.


 

Article Details

Section
Articles

References

Natalia, M., Aguskamar, A., Atmaja, J., Muluk, M., & Fitria, D. R. (2019). Identifikasi Faktor-Faktor Penyebab Cost Over run Pada Proyek Konstruksi Jalan di Sumatera Barat. Jurnal Ilmiah Rekayasa Sipil, 16(1), 28-38.

Hesna, Y., Sunaryati, J., & Hidayati, A. (2021). COVID-19 pandemic impact: an identification of the cause of cost overrun in construction project. In E3S Web of Conferences (Vol. 331, p. 01014). EDP Sciences.

Dapu, Y. C., Dundu, A. K. T., & Walangitan, D. R. (2016). FAKTOR –FAKTOR YANG MENYEBABKAN COST OVERRUN PADA PROYEK KONSTRUKSI. Jurnal Sipil Statik, 4(10).

Annamalaisami, C. D., & Kuppuswamy, A. (2021). Managing cost risks: Toward a taxonomy of cost overrun factors in building construction projects. ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering, 7(2), 04021021.

Iqbal, A., Rehman, H. S. U., Munir, M., Ashiq, M., Omar, A., Haider, Z., ... & Jahanzaib, M. (2019). Time and cost overrun in construction projects of Pakistan. Pakistan Journal of Engineering and Technology, 2(2), 22-29.

Christopher, J., & Waty, M. (2021). IDENTIFIKASI FAKTOR PENYEBAB COST OVERRUN (PEMBENGKAKAN BIAYA) PADA PROYEK RUMAH TINGGAL. JMTS: Jurnal Mitra Teknik Sipil, 633-640.

Remi, F. F. (2017). Kajian faktor penyebab cost overrun pada proyek konstruksi gedung. Jurnal Teknik Mesin Mercu Buana, 6(2), 94-101.

Ling, F. Y., Zhang, Z., & Yew, A. Y. (2022). Impact of COVID-19 pandemic on demand, output, and outcomes of construction projects in Singapore. Journal of management in engineering, 38(2), 04021097.

Alsharef, A., Banerjee, S., Uddin, S. J., Albert, A., & Jaselskis, E. (2021). Early impacts of the COVID-19 pandemic on the United States construction industry. International journal of environmental research and public health, 18(4), 1559.

Kometa, S. T., Olomolaiye, P. O., & Harris, F. C. (1994). Attributes of UK construction clients influencing project consultants' performance. Construction Management and economics, 12(5), 433-443.

Kamaruddeen, A. M., Sung, C. F., & Wahi, W. (2020). A study on factors causing cost overrun of construction projects in Sarawak, Malaysia. Labour (human), 2(7), 13.

Andian, V., & Waty, M. (2022). PERINGKAT FAKTOR-FAKTOR YANG MEMPENGARUHI TERJADINYA COST OVERRUN PADA PROYEK KONSTRUKSI PADA MASA PANDEMI COVID-19. JMTS: Jurnal Mitra Teknik Sipil, 671-680.

Waty, M., & Sulistio, H. (2022). CAUSES FOR THE CHANGE ORDERS IN ROAD CONSTRUCTION: REVIEWED FROM OWNER. Komunikácie, 24(2).