The Rank of Factors Affecting Labor Productivity on Construction Projects

Main Article Content

Celine
Mega

Abstract

Human resources or labor is one of the factors that influence the success of a construction project. Based on this


statement, it is necessary to analyze labor productivity. Many factors can affect labor productivity. This


research aims to determine the ranking of factors that affect labor productivity in high-rise building


construction projects in Jabodetabek. These factors are divided into 2 parts, namely internal factors, and


external factors. Internal factors are factors derived from within labor control and external factors are factors


derived from outside labor control. The method used in this research is a quantitative research method using a


questionnaire. Furthermore, this research is analyzed using IBM SPSS software for validity and reliability


testing and analyzed using the Relative Importance Index (RII) to determine the ranking of these factors.


Based on the results of the validity and reliability tests, 18 variables were declared valid and reliable. The


highest ranking of the factors that affect labor productivity when viewed as a whole is work skills which is a


variable from internal factors with an RII value of 0,906, while the highest ranking of external factors is


equipment quality with an RII value of 0,883.

Article Details

Section
Articles
Author Biographies

Celine, Tarumanagara University

Civil Engineering Department, Faculty of Engineering

Mega, Tarumanagara University

Civil Engineering Department, Faculty of Engineering

References

Husodo, I. T., Suwandi, P. A. P., & Gunawan, A. (2020, September). Risk Management

Affecting the Cost and Time of the Structure Work Development Project of High-Level

Building (A Case Study of the Alton Apartment Tembalang City Semarang Project). In

Journal of Physics: Conference Series (Vol. 1625, No. 1, p. 012023). IOP Publishing.

Wijayaningtyas, M., Seran, S., Mulyadi, L., & Inskandar, T. (2019). Pengaruh Faktor

Eksternal dan Internal terhadap Produktivitas Tenaga Kerja Proyek Pembangunan Gedung.

Hanna, A. S., Russell, J. S., Nordheim, E. V., & Bruggink, M. J. (1999). Impact of change

orders on labor efficiency for electrical construction. Journal of construction engineering and

management, 125(4), 224-232.

Jarkas, A. M., & Bitar, C. G. (2012). Factors affecting construction labor productivity in

Kuwait. Journal of construction engineering and management, 138(7), 811-820.

Nayoan, C. R. (2023). THE EFFECT OF NOISE INTENSITY TOWARDS HEARING

THRESHOLD VALUE OF WORKERS AT PT. X AND PT. Y PALU. Jurnal Kedokteran,

(1), 1265-1271.

Rini, I. P. (2017). Pengaruh Produktivitas Tenaga Kerja Terhadap Kinerja Waktu Proyek Pada

Bangunan Bertingkat. Jurnal Infrastruktur, 3(2), 127-135.

Dharmawan, R. K. (2020). SURVEY MENGENAI FAKTOR–FAKTOR YANG

MEMENGARUHI PRODUKTIVITAS PEKERJA PADA BEBERAPA PROYEK

KONSTRUKSI DI. Jurnal Dimensi Pratama Teknik Sipil, 9(1), 141-148.

Hernandi Y, Tamtana JS. Faktor-Faktor yang Mempengaruhi Produktivitas Pekerja pada

Pelaksanaan Konstruksi Gedung Bertingkat. JMTS J Mitra Tek Sipil. 2020;3(2):299–312.

Nainggolan, R., Purwoko, A., & Yuliarso, M. Z. (2012). Faktor–Faktor Yang Mempengaruhi

Produktivitas Tenaga Kerja Pemanen Sawit Pada PT. Bio Nusantara Teknologi, Bengkulu.

Jurnal AGRISEP: Kajian Masalah Sosial Ekonomi Pertanian Dan Agribisnis, 35-42.

Durdyev, S., Ismail, S., & Kandymov, N. (2018). Structural equation model of the factors

affecting construction labor productivity. Journal of Construction Engineering and

Management, 144(4), 04018007.

Satrya, T. A., & Waty, M. (2020). Faktor-Faktor yang Mempengaruhi Produktivitas Tenaga

Kerja pada Bangunan High Rise di Republik Indonesia. JMTS: Jurnal Mitra Teknik Sipil,

-1326.

El-Gohary, K. M., & Aziz, R. F. (2014). Factors influencing construction labor productivity in

Egypt. Journal of management in engineering, 30(1), 1-9.

El-Batreek, A. H., Ezeldin, A. S., & Elbarkouky, M. M. (2013). A framework for construction

labor productivity improvement in Egypt. In AEI 2013: Building Solutions for Architectural

Engineering (pp. 1007-1017).

Chomeya, R. (2010). Quality of psychology test between Likert scale 5 and 6 points. Journal

of Social Sciences, 6(3), 399-403.

Felixius, J., & Waty, M. (2021). Analisis Sisa Material Dan Penyebab Utamanya Pada Proyek

Bangunan Rumah Tinggal. JMTS: Jurnal Mitra Teknik Sipil, 343-352.