The Rank of Factors Affecting Labor Productivity on Construction Projects
Main Article Content
Abstract
Human resources or labor is one of the factors that influence the success of a construction project. Based on this
statement, it is necessary to analyze labor productivity. Many factors can affect labor productivity. This
research aims to determine the ranking of factors that affect labor productivity in high-rise building
construction projects in Jabodetabek. These factors are divided into 2 parts, namely internal factors, and
external factors. Internal factors are factors derived from within labor control and external factors are factors
derived from outside labor control. The method used in this research is a quantitative research method using a
questionnaire. Furthermore, this research is analyzed using IBM SPSS software for validity and reliability
testing and analyzed using the Relative Importance Index (RII) to determine the ranking of these factors.
Based on the results of the validity and reliability tests, 18 variables were declared valid and reliable. The
highest ranking of the factors that affect labor productivity when viewed as a whole is work skills which is a
variable from internal factors with an RII value of 0,906, while the highest ranking of external factors is
equipment quality with an RII value of 0,883.
Article Details
This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.
References
Husodo, I. T., Suwandi, P. A. P., & Gunawan, A. (2020, September). Risk Management
Affecting the Cost and Time of the Structure Work Development Project of High-Level
Building (A Case Study of the Alton Apartment Tembalang City Semarang Project). In
Journal of Physics: Conference Series (Vol. 1625, No. 1, p. 012023). IOP Publishing.
Wijayaningtyas, M., Seran, S., Mulyadi, L., & Inskandar, T. (2019). Pengaruh Faktor
Eksternal dan Internal terhadap Produktivitas Tenaga Kerja Proyek Pembangunan Gedung.
Hanna, A. S., Russell, J. S., Nordheim, E. V., & Bruggink, M. J. (1999). Impact of change
orders on labor efficiency for electrical construction. Journal of construction engineering and
management, 125(4), 224-232.
Jarkas, A. M., & Bitar, C. G. (2012). Factors affecting construction labor productivity in
Kuwait. Journal of construction engineering and management, 138(7), 811-820.
Nayoan, C. R. (2023). THE EFFECT OF NOISE INTENSITY TOWARDS HEARING
THRESHOLD VALUE OF WORKERS AT PT. X AND PT. Y PALU. Jurnal Kedokteran,
(1), 1265-1271.
Rini, I. P. (2017). Pengaruh Produktivitas Tenaga Kerja Terhadap Kinerja Waktu Proyek Pada
Bangunan Bertingkat. Jurnal Infrastruktur, 3(2), 127-135.
Dharmawan, R. K. (2020). SURVEY MENGENAI FAKTOR–FAKTOR YANG
MEMENGARUHI PRODUKTIVITAS PEKERJA PADA BEBERAPA PROYEK
KONSTRUKSI DI. Jurnal Dimensi Pratama Teknik Sipil, 9(1), 141-148.
Hernandi Y, Tamtana JS. Faktor-Faktor yang Mempengaruhi Produktivitas Pekerja pada
Pelaksanaan Konstruksi Gedung Bertingkat. JMTS J Mitra Tek Sipil. 2020;3(2):299–312.
Nainggolan, R., Purwoko, A., & Yuliarso, M. Z. (2012). Faktor–Faktor Yang Mempengaruhi
Produktivitas Tenaga Kerja Pemanen Sawit Pada PT. Bio Nusantara Teknologi, Bengkulu.
Jurnal AGRISEP: Kajian Masalah Sosial Ekonomi Pertanian Dan Agribisnis, 35-42.
Durdyev, S., Ismail, S., & Kandymov, N. (2018). Structural equation model of the factors
affecting construction labor productivity. Journal of Construction Engineering and
Management, 144(4), 04018007.
Satrya, T. A., & Waty, M. (2020). Faktor-Faktor yang Mempengaruhi Produktivitas Tenaga
Kerja pada Bangunan High Rise di Republik Indonesia. JMTS: Jurnal Mitra Teknik Sipil,
-1326.
El-Gohary, K. M., & Aziz, R. F. (2014). Factors influencing construction labor productivity in
Egypt. Journal of management in engineering, 30(1), 1-9.
El-Batreek, A. H., Ezeldin, A. S., & Elbarkouky, M. M. (2013). A framework for construction
labor productivity improvement in Egypt. In AEI 2013: Building Solutions for Architectural
Engineering (pp. 1007-1017).
Chomeya, R. (2010). Quality of psychology test between Likert scale 5 and 6 points. Journal
of Social Sciences, 6(3), 399-403.
Felixius, J., & Waty, M. (2021). Analisis Sisa Material Dan Penyebab Utamanya Pada Proyek
Bangunan Rumah Tinggal. JMTS: Jurnal Mitra Teknik Sipil, 343-352.