PERBAIKAN TATA LETAK IKM VULKANISIR BAN GUNUNG TIMUR DI KOTA DUMAI
Main Article Content
Abstract
Gunung Timur Tire Retreading SME, located in West Dumai District, Dumai City, is experiencing inefficiencies in its facility layout. These inefficiencies result in irregular workflows, longer material handling distances, and suboptimal space utilization, which directly affect operational efficiency and productivity. This study aims to improve the facility layout to enhance workflow efficiency through the application of the Systematic Layout Planning (SLP) method and a graph-based approach. The research process includes field data collection, preparation of the operation process chart, from-to chart, activity relationship chart, relationship diagram, space requirement calculation, as well as the design and evaluation of alternative layouts. The analysis results show that the proposed layout using the SLP method reduced the total material handling distance from 545.71 meters to 346.8 meters, while the layout using the graph-based method resulted in a distance of 391.3 meters. The layout proposed using the SLP method demonstrated the highest efficiency, achieving a 36.45% reduction in material handling distance, improved workflow organization, and more optimal space utilization. Eventually, the implementation of the SLP method offers a strategic solution to improve the operational efficiency and productivity of the tire retreading IKM.
Article Details
Section

This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.
References
[1] A.T. Novitasari, “Kontribusi UMKM Terhadap Pertumbuhan Ekonomi Era Digitalisasi Melalui Peran Pemerintah,” JABE (Journal Appl. Bus. Econ., vol. 9, no. 2, pp. 184- 204, 2022, doi: 10.30998/jabe.v9i2.13703.
[2] F. Amelia, A.H. Manurung, M. Anggraeni, N.M. Nasution, K.A. Husyairi, and T.N. Ainun, “Perancangan Ulang Tata Letak Fasilitas Melalui Metode Activity Relationship Chart (ARC) dan Activity Relationship Diagram (ARD),” J. Teknol. dan Manaj. Ind. Terap., vol. 3, no. 2, pp. 171–180, 2024, doi: 10.55826/jtmit.v3i2.362.
[3] P.S. Aiba, I.D. Palandeng, and M.M. Karuntu, “Analisis Tata Letak Gudang pada PT Sapta Sari Tama Cabang Manado,” J. EMBA, vol. 10, no. 4, pp. 780–791, 2022.
[4] D.P. Utomo, S. Adji, and D.W. Wahyuningsih, “Penerapan Layout dengan Metode Systematic Layout Planning dalam Meningkatkan Kelancaran Produksi pada UD Temon Raya Kabupaten Pacitan,” Bussman J. Indones. J. Bus. Manag., vol. 2, no. 3, pp. 564-573, 2022.
[5] A.M. Rizal, T.G. Bhagya, and B. Ubaedillah, “Perancangan Ulang Tata Letak Fasilitias pada Area Produksi Tempe dengan Metode Systematic Layout Planning (SLP) di PD TRI AS,” J. Ilm. Nas. Bid. Ilmu Tek., vol. 13, no. 01, pp. 43–54, 2025.
[6] S. Wignjosoebroto, Tata Letak Pabrik dan Pemindahan Bahan, 4 ed. Surabaya: Guna Widya, 2020.
[7] B. Bintang, L. Gozali, and L. Widodo “Redesign Layout Planning of Raw Material Area and Production Area Using Systematic Layout Planning (SLP) Methods (Case Study of CV Oto Boga Jaya),” IOP Conf. Ser. Mater. Sci. Eng., vol. 852, no. 1, 2020, doi: 10.1088/1757-899X/852/1/012122
[8] S. Khariwal, P. Kumar, and M. Bhandari, “Layout Improvement of Railway Workshop Using Systematic Layout Planning (SLP) - A Case Study,” Mater. Today Proc., vol. 44, pp. 1–7, 2020, doi: 10.1016/j.matpr.2020.10.444.
[9] D. Ramadhan, L. Widodo, L. Gozali, I.W. Sukania, F.J. Daywin, and C.O. Doaly, “Redesigning The Facility Layout with Systematic Layout Planning Method and Lean Manufacturing Approach on The Production Floor At PT Baruna Trayindo Jaya,” Proc. Int. Conf. Ind. Eng. Oper. Manag., pp. 2596–2609, 2021, doi: 10.46254/an11.20210481.
[10] A.P. Lista, G.L. Tortorella, M. Bouzon, S. Mostafa, and D. Romero, “Lean Layout Design: A Case Study Applied to The Textile Industry,” Production, vol. 31, pp. 1–16, 2021, doi: 10.1590/0103-6513.20210090.
[11] E. Prihastono and F.A. Ekoanindiyo, “Perancangan Ulang Tata Letak Produksi untuk Mengurangi Biaya Material Handling dengan Pendekatan From To Chart dan Activity Relationship Chart,” Matrik J. Manaj. dan Tek. Ind. Produksi, vol. 22, no. 2, pp. 121– 128, 2022, doi: 10.30587/matrik.v22i2.2741.
[12] N. Trisolvena, “Planning The Layout of Production Facilities (Case Study of Diera Mutiara Internasional in Yogyakarta),” Greenation Int. J. Eng. Sci., vol. 1, no. 1, pp. 40–47, 2023, doi: https://doi.org/10.38035/gijes.v1i1.
[13] E. Ramos-Valle, A. Paulino, P. Chavez, J.C. Alvarez, and S. Nallusamy, “Pilot Implementation of Innovative Proposal for Service Level Improvement in a Spare Parts Trading Company,” Int. J. Eng. Res. Africa, vol. 62, pp. 173–187, 2022, doi: 10.4028/p- 70sd0q.
[14] M.S. Amoretti-Magallanes, P.A. Carpio-Montesinos, and J.A. Corzo-Chavez, “Production Model Based On Lean Manufacturing and Systematic Layout Planing To Reduce Waste in a Company in the Poultry Sector: A Case Study,” Int. J. Environ. Pollut. Remediat., vol. 12, pp. 44–51, 2024, doi: 10.11159/icmie24.107.
[15] D.H. Pamungkas, M.S. Huda, R. Septiawan, A.J. Prasetya, R.A. Robby, and F. Yuamita, “Optimisasi Systematic Layout Planning dan Perbandingan Work Sampling untuk Efisiensi Waktu Produksi di UD Cantenan,” J. Kaji. dan Penelit. Umum, vol. 3, no. 1, pp. 285–306, 2025, doi: https://doi.org/10.47861/jkpu-nalanda.v3i1.1551.
[16] I. Adiasa, Sartika, and N. Hudaningsih, “Perancangan Tata Letak Fasilitas Gudang pada Proyek Pembangunan Jetty PLTMGU Lombok Peaker Menggunakan Metode Systematic Layout Planning (SLP) dengan Algoritma Blocplan,” J. Inform. Teknol. dan Sains, vol. 5, no. 1, pp. 202–209, 2023, doi: 10.51401/jinteks.v5i1.2609.
[17] T.H. Suryatman, M.E. Kosim, Ricardo, and Z. Muttaqien, “Perbaikan Tata Letak Mesin dengan Metode Systematic Layout Planning (SLP) di PT Prisma Rekayasa Unggul,” Journal Ind. Manuf., vol. 9, no. 2, pp. 101–110, 2024.
[18] Y. Calderon-Ayala, J. Vitor-Sanchez, J.C. Quiroz-Flores, and A. Flores-Perez, “Increased Operational Efficiency in an SME in the Textile Industry Through a Production Model Based On Lean, TPM, and SLP Tools,” Proc. LACCEI Int. Multiconference Eng. Educ. Technol., pp. 1–9, 2023, doi: 10.18687/laccei2023.1.1.186.
[19] T. Wang and Y. Feng, “Workshop Layout Optimation and Simulation Analysis Based on SLP: A Case Study,” Proceedings of the 2023 4th International Conference on Management Science and Engineering Management (ICMSEM 2023), pp. 1443–1453, 2024, doi: 10.2991/978-94-6463-256-9_146.
[20] F.Z. Martin, M.I.H. Umam, M. Yola, Harpito, and M. Nur, “Usulan Perbaikan Tata Letak Fasilitas Menggunakan Metode Systematic Layout Planning (SLP) dan Simulasi Arena,” J. Perangkat Lunak, vol. 6, no. 1, pp. 166–180, 2024, doi: 10.32520/jupel.v6i1.3071.
[21] A.A. Putri and Suhartini, “Relayout Tata Letak Fasilitas untuk Meminimalkan Jarak Material Handling (Studi Kasus CV Dholpin Industries Sidoarjo),” J. Manaj. dan Tek. Ind., vol. 25, no. 1, pp. 39–48, 2024, doi: 10.350587/Matrik.
[22] B.R. Pratama, E. Yuliawati, and H. Nugroho, “Perancangan Ulang Tata Letak Fasilitas Gudang dengan Metode Systematic Layout Planning dan BLOCPLAN untuk Meminimasi Jarak Bongkar dan Muat Material pada Gudang PT Sukses Indah Metalindo Surabaya,” Senastitan, vol. 5, pp. 1–9, 2025.
[23] K. Zhao, “Research on Layout Optimization of Auto Seat Assembly Workshop based on SLP,” Ind. Eng., vol. 7, no. 2, pp. 175–187, 2025.