ANALISIS PEMBOROSAN PRODUKSI KAIN PANEL MELALUI PENDEKATAN LEAN SUPPLY CHAIN
Main Article Content
Abstract
This study assesses the efficiency of a panel fabric production line at a Bekasi textile company using a Lean Supply Chain approach. Selected for its highest defect rate (62,919 defects from October 2024 to March 2025), 14 machines, and longest cycle time (14 days per batch), the line’s efficiency, dominant wastes, and improvement opportunities were examined. A descriptive single-case design gathered data through in-depth interviews, focus groups, and a seven-waste questionnaire. Process analysis began with Current Value Stream Mapping (VSM), followed by Value Stream Analysis Tools (VALSAT) via Process Activity Mapping (PAM) and Process Cycle Efficiency (PCE) calculations, then a 5 Whys analysis. PAM results indicated a PCE of 34.33%. The 5 Whys identified three root causes of waste: (1) lack of standardization and visual management, (2) unintegrated information flow, and (3) limited human-resource and equipment capacity. Key wastes included excess motion, inefficient material transport, inventory buildup, and waiting time. Recommendations include implementing 5S for workplace standardization, digitizing production with a pull system, and applying heijunka, kanban, and balanced flow to level production. Scheduled machine maintenance is advised to reduce defects. Adopting Hoshin Kanri and Future VSM will support continuous improvement and strategic alignment. These measures aim to reduce waste, boost productivity, sustain competitiveness, and foster sustainable business.
Article Details

This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.
References
[1] M.A. Saryatmo and R. Sukwadi, "Peran Mediasi Lean Manufaktur Terhadap Hubungan Antara Rantai Pasok Digital dan Kualitas Produk," Jurnal Praktik Keinsinyuran, vol. 1, no. 2, pp. 71-80, 2024.
[2] Y.A. Kusuma, H.A. Khoiri and F.D. Aryaningtyas, "Penilaian Risiko Kualitas Pada Proses Produksi Kain di PT.XYZ," Journal Of Industrial Engineering And Technology (Jointech) Universitas Muria Kudus, vol. 4, no. 1, pp. 48-53, 2023.
[3] R.M. Sari and E. Nugraha, "Lean Supply Chain Sebagai Strategi Peningkatan Produktivitas (Studi Kasus: PT. Indah Kiat Pulp & Paper Tbk.)," Competitive, vol. 14, no. 2, pp. 27-35, 2019.
[4] A.T. Wibowo and N.U. Handayani, "Penerapan Lean Supply Chain Pada Proses Loading Pupuk in Bag di Pelabuhan PT. Petrokimia Gresik," in Prosiding Seminar Nasional Multi Disiplin Ilmu & Call For Papers Unisbank (SENDI_U) Ke-2 Tahun 2016, Semarang, 2016.
[5] P. Myerson, Lean Supply Chain & Logistics Management, New York: McGrow-Hill, 2012.
[6] C. Schutte, W. Niemann and T. Kotze, "Exploring Relationship Power in Supply Chain Sustainability Practices: A Case Study of a South African Hospital Group," South African Journal of Industrial Engineering, vol. 33, no. 1, pp. 154-176, 2022.
[7] D.R. Ayu and B.N. Alfa, "Pengurangan Pemborosan Dengan Metode Value Stream Mapping Pada Proses Penyediaan Medicines & Consumables di Perusahaan Jasa Kesehatan DKI Jakarta," Jurnal Penelitian dan Aplikasi Sistem dan Teknik Industri, vol. 16, no. 3, pp. 360-373, 2022.
[8] Y. Maulana, "Identifikasi Waste Dengan Menggunakan Metode Value Stream Mapping Pada Industri Perumahan," JIEOM, vol. 2, no. 2, pp. 12-19, 2019.
[9] A. Salim, H.J. Kristina and C.O. Doaly, "Penerapan Prinsip Lean Manufacturing dalam Proses Produksi di PT. Jotun Indonesia," Jurnal Mitra Teknik Industri, vol. 1, no. 2, pp. 116-125, 2022.
[10] D.S. Kansul and G. Karabay, "Increasing the Process Cycle Effficiency of Men's Trousers Assembly line," Tekstil Ve konfeksiyon, vol. 29, no. 2, pp. 253-261, 2019.
[11] Kevin, M.A. Saryatmo and Andres, "Minimasi Waste Pada Aktivitas Proses Produksi Dengan Pendekatan Value Stream Mapping (Studi Kasus: UKM Garmen X)," Jurnal Mitra Teknik Industri, vol. 2, no. 2, pp. 136-144, 2023.
[12] F.A. Saputra and D.T. Santoso, "Analysis of Production Defects Using The 5 WHYS and RCA Method at PT.X," Transmisi, vol. 20, no. 2, pp. 52-59, 2024.
[13] B. Suhardi, K.M.H. Putri and W.A. Jauhari, "Implementation of Value Stream Mapping to Reduce Waste in a Textile Products Industry," Cogent Engineering, vol. 7, no. 1, pp. 1-25, 2020.
[14] R.A. Mahen, H. Batubara and D. Wijayanto, "Identifikasi Waste Melalui Proces Activity Mapping dan Pendekatan Lean Manufacturing Pada CV. Kreatifika Harapan Terbang Abadi," Industrial Engineering and Management System, vol. 7, no. 2, pp. 114-121, 2023.
[15] P. Rewers, J. Trojanowska and P. Chabowski, "Tools and Methods of Lean Manufacturing - A Literature Review," Technological Forum, vol. 7, no. 6, pp. 1-6, 2016.
[16] A. Sulaksono and J. Nursyamsi, "Perkembangan ERP Bidang Industri Manufaktur Era Transformasi Digital," Jurnal Akuntansi dan Manajemen Bisnis, vol. 2, no. 2, pp. 106-119, 2022.
[17] I. Leksic, N. Stefanic and I. Veza, "The Impact of Using Different Lean Manufacturing Tools on Waste Reduction," APEM, vol. 15, no. 1, pp. 81-92, 2020.
[18] D. Souad, C. Messaouda and K. Maazouzi, "Planning Using Hoshin Kanri,"
International Jurnal of Academic Research in Economics and Management Sciences, vol. 6, no. 4, pp. 1-13, 2017.