ANALISIS SIX BIG LOSSES PADA MESIN HIGH SPEED BLENDER DI PERUSAHAAN PRODUKSI TEPUNG

Main Article Content

Michael Jordy Chang
Wilson Kosasih
Ahmad

Abstract

This study was conducted in a flour-producing manufacturing company. Based on observation and interview results, the problems faced are engine breakdown and downtime issues on HSB engines and engine components that are rarely replaced so production targets are rarely achieved. This study aims to analyze Total Productive Maintenance by calculating the OEE and the six big losses of the machine, as well as searching for the most critical components of the RPN value using the FMEA method. to find out the biggest damage to the HSB machine. The purpose of this study was to find out the causes of less optimal engine performance and to calculate the machine's efficiency. The average OEE score from September 2021 to August 2022 was 75.79%. With 91.15% availability, performance 87.69% and quality rate 94.85%. Meanwhile, the calculation of the six big losses is known to be the largest loss in reduction speed losses, which has an average rate of 11.52%, Equipment Failure Loss of 4.61%, Set up loss of 4.25%, defect loss of 4.10%, idle and minor stop pages 2.18% and the smallest loss was a reduction of 2.18%. The main priority of improvement is bearing with the highest RPN value of 60.

Article Details

Section
Articles

References

S. Hadi, Perawatan dan Perbaikan Mesin Industri, Jakarta: Andi Offset, 2019.

J. Purnomo, N. Affandi, A. Rahmatullah, “Analisis Penerapan Perawatan Motor Konveyor Mesin Xray Dengan Menggunakan Metode Reability Centered Maintenance (RCM) Pada PT. Tristan Engineering,” Jurnal Taguchi: Jurnal Ilmiah Teknik dan Manajemen Industri, Vol. 1, No. 2, pp. 154-169, 2021.

G. Muhaemin, A. E. Nugraha, “Penerapan Total Productive Maintenance (TPM) pada Perawatan Mesin Cutter di PT. XYZ,” Jurnal Ilmiah Wahana Pendidikan, Vol. 8, No. 9, pp. 205-219, 2022.

A. S. Habib dan H. H. Supriyanto, “Pengukuran Nilai Overall Equipment Effectiveness (OEE) Sebagai Pedoman Perbaikan Efektivitas Mesin CNC Cutting,” Jurnal Teknik Pomits, Vol. 1, No. 1, pp. 1-6, 2012.

B. S. Waluyo, Chriswahyudi, Restianingsih, “Analisa Perbaikan Produktivitas Menggunakan Metode Overall Equipment Effectiveness (OEE) Pada Mesin Filling Dengan Pendekatan Six Big Losses Untuk Mencari Penyebab Losses Tertinggi Pada Produksi Skincare Studi Kasus PT. XYZ,” Jurnal Teknik: Universitas Muhammadiyah Tangerang, Vol. 8, No. 1, pp. 90-99, 2019.

M. McLure and W. J. Samuels, Pareto, Economics and Society, Ney York: Routledge, 2014.

A. F. Assidik, Kardiman, “Faktor-Faktor yang mempengaruhi Produktivitas Mesin Forging Press dengan Metode Failure Model and Effectiveness Analytic (FMEA),” Jurnal Ilmiah Wahana Pendidikan, Vol. 8, No. 15, pp. 24-31, 2022.

N. Aryanto, A. H. Maksum, “Analisis Sistem Manajemen Pergudangan dan Perancangan Standard Operating Procedure (SOP) Pada PT. X,” Jurnal Ilmiah Wahana Pendidikan, Vol. 8, No. 5, pp. 17-30, 2022.

D. I. Rinawati, N. C. Dewi, “Analisis Penerapan Total Productive Maintenance (Tpm) Menggunakan Overall Equipment Efectiveness (OEE) Dan Six Big Losses Pada Mesin Cavitec di PT. Essentra Surabaya,” Prosiding SNATIF, Vol. 1, pp. 21-26, 2014.

C. Anam, Sukanta, “Analisis Penerapan Total Productive Maintenance (TPM) untuk Mendapatkan Nilai Overall Equipment Effectiveness (OEE) di PT. XYZ,” Jurnal Ilmiah Wahana Pendidikan, Vol. 8, No. 13, pp. 75-81, 2022.